Research on startup scheme for newly-built thermal power plants without auxiliary steam and start-up boiler

Hou Guo-wei

Open publisher page 0 citations

Abstract

The startup scheme was presented for newly-built coal-fired power plant without any start-up boilers and auxiliary steam.According to this scheme,in the absence of external steam(including the steam from start-up boiler),a complete test and start-up procedures were accomplished.In this case,the boiler was directly ignited and heated by oil gun and the desuperheating and decompressive device was used to provide main steam for the heating of grand seal.Such grand-seal heating steam can be adjusted according to the cylinder temperature of steam turbine and available for the startup of power units out of operation after the overhaul.It solved the problem of unit restarting without auxiliary steam after the overhaul of power units.

About this research paper

What this paper is about

The startup scheme was presented for newly-built coal-fired power plant without any start-up boilers and auxiliary steam.According to this scheme,in the absence of external steam(including the steam from start-up boiler),a complete test and start-up procedures were accomplished.In this case,the boiler was directly ignited and heated by oil gun and the desuperheating and decompressive device was used to provide main steam for the heating of grand seal.Such grand-seal heating steam can be adjusted according to the cylinder temperature of steam turbine and available for the startup of power units out of operation after the overhaul.It solved the problem of unit restarting without auxiliary steam after the overhaul of power units.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The startup scheme was presented for newly-built coal-fired power plant without any start-up boilers and auxiliary steam.According to this scheme,in the absence of external steam(including the steam from start-up boiler),a complete test and start-up procedures were accomplished.In this case,the boiler was directly ignited and heated by oil gun and the desuperheating and decompressive device was used to provide main steam for the heating of grand seal.Such grand-seal heating steam can be adjusted according to the cylinder temperature of steam turbine and available for the startup of power units out of operation after the overhaul.It solved the problem of unit restarting without auxiliary steam after the overhaul of power units.

Key concepts: Boiler (water heating), Flash boiler, Steam drum, Boiler feedwater pump, Engineering, Thermal power station, Steam-electric power station, Steam turbine