Discussion on problems from presplit blasting in actual construction
Deng Ting
Abstract
Deng Ting
Abstract
Based on the engineering practice of the side slope excavation of Dayanchi section within the road for the construction traffic of Guandi Hydropower Station, the problems such as the selection of blasthole distance for presplit blasting, and the rock ridge, the levelness of the presplit face, lower hole-making rate of the auxiliary blastholes after the presplit blasting, the blasting network for prespliting and blasting zone and the angle change of the presplit hole etc. are analyzed; for which the specific solutions are put forward herein as well.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on the engineering practice of the side slope excavation of Dayanchi section within the road for the construction traffic of Guandi Hydropower Station, the problems such as the selection of blasthole distance for presplit blasting, and the rock ridge, the levelness of the presplit face, lower hole-making rate of the auxiliary blastholes after the presplit blasting, the blasting network for prespliting and blasting zone and the angle change of the presplit hole etc. are analyzed; for which the specific solutions are put forward herein as well.
Key concepts: Rock blasting, Hydropower, Ridge, Excavation, Geotechnical engineering, Engineering, Section (typography), Civil engineering