A Pre-stressed Concrete Continuous Beam Bridge Construction Control Technique
LI Hai-xiang
Abstract
LI Hai-xiang
Abstract
Combined with the engineering characteristic of Longwan Bridge,this paper analyzed the control technique of main construction parameters,and introduced the control emphasis of pre-stressed concrete continuous beam bridge during the bridge construction.the control emphasis includes deflection control and stress control.It also generalized the control method of continuous beam bridge to guarantee the bridge quality is under control.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Combined with the engineering characteristic of Longwan Bridge,this paper analyzed the control technique of main construction parameters,and introduced the control emphasis of pre-stressed concrete continuous beam bridge during the bridge construction.the control emphasis includes deflection control and stress control.It also generalized the control method of continuous beam bridge to guarantee the bridge quality is under control.
Key concepts: Bridge (graph theory), Deflection (physics), Structural engineering, Beam (structure), Engineering, Control (management), Beam bridge, Computer science