2007Shanxi ArchitectureRequires access

On claims in highway engineering construction

Han De-yi

Open publisher page 0 citations

Abstract

Combined with management experience,the author discusses the condition of claims' occurrence and claim methods and techniques started from the meaning of claims,illustrates the calculation of claims,and points out that wining the tender with low price must be assisted by powerful contract management and man should timely grasp claim information and carry out claims using rational method and techniques,in order to gain double win in engineering quality and benefits.

About this research paper

What this paper is about

Combined with management experience,the author discusses the condition of claims' occurrence and claim methods and techniques started from the meaning of claims,illustrates the calculation of claims,and points out that wining the tender with low price must be assisted by powerful contract management and man should timely grasp claim information and carry out claims using rational method and techniques,in order to gain double win in engineering quality and benefits.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Combined with management experience,the author discusses the condition of claims' occurrence and claim methods and techniques started from the meaning of claims,illustrates the calculation of claims,and points out that wining the tender with low price must be assisted by powerful contract management and man should timely grasp claim information and carry out claims using rational method and techniques,in order to gain double win in engineering quality and benefits.

Key concepts: GRASP, Meaning (existential), Quality (philosophy), Order (exchange), Arrow, Actuarial science, Construction management, Economics

Related papers

Back to paper searchBrowse research topicsOriginal source
On claims in highway engineering construction — Research Paper | ScholarLens