2007Shanxi ArchitectureRequires access

Design and construction of steel sheet pile cofferdam

Gao Man-zhe

Open publisher page 0 citations

Abstract

According to construction conditions of new Sanyanghe bridge,this paper introduces calculating method and engineering attentions of structural design of waterproof cofferdam by using steel sheet pile in deepwater foundation construction,and shows by on-site construction that this construction scheme is safe and reliable.

About this research paper

What this paper is about

According to construction conditions of new Sanyanghe bridge,this paper introduces calculating method and engineering attentions of structural design of waterproof cofferdam by using steel sheet pile in deepwater foundation construction,and shows by on-site construction that this construction scheme is safe and reliable.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

According to construction conditions of new Sanyanghe bridge,this paper introduces calculating method and engineering attentions of structural design of waterproof cofferdam by using steel sheet pile in deepwater foundation construction,and shows by on-site construction that this construction scheme is safe and reliable.

Key concepts: Cofferdam, Sheet pile, Foundation (evidence), Bridge (graph theory), Pile cap, Engineering, Pile, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Design and construction of steel sheet pile cofferdam — Research Paper | ScholarLens