2012Mechanical Management and DevelopmentRequires access

Construction Control of Fill Wall Cracks

Wei An-bao

Open publisher page 0 citations

Abstract

Combination of work experience,for filling the cracks in the masonry works problem,analyzed the reasons for crack formation. Proposed targeted prevention measures according to the causes of the crack,to reduce the fill wall cracks phenomenon in the costruction.

About this research paper

What this paper is about

Combination of work experience,for filling the cracks in the masonry works problem,analyzed the reasons for crack formation. Proposed targeted prevention measures according to the causes of the crack,to reduce the fill wall cracks phenomenon in the costruction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Combination of work experience,for filling the cracks in the masonry works problem,analyzed the reasons for crack formation. Proposed targeted prevention measures according to the causes of the crack,to reduce the fill wall cracks phenomenon in the costruction.

Key concepts: Masonry, Structural engineering, Forensic engineering, Work (physics), Materials science, Engineering, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction Control of Fill Wall Cracks — Research Paper | ScholarLens