Construction quality monitoring of cast-in-place bored pile
Xu Ju
Abstract
Xu Ju
Abstract
Combined with engineering application of cast-in-place bored pile,from verticality in hole building,thickness of settlement,steel reinforcement cage,underwater concrete construction and other aspects construction quality control of cast-in-place bored pile is discussed in order to ensure engineering quality and smooth running of work.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Combined with engineering application of cast-in-place bored pile,from verticality in hole building,thickness of settlement,steel reinforcement cage,underwater concrete construction and other aspects construction quality control of cast-in-place bored pile is discussed in order to ensure engineering quality and smooth running of work.
Key concepts: Pile, Settlement (finance), Quality (philosophy), Engineering, Civil engineering, Work (physics), Underwater, Construction engineering