On quality control of bored pile
Huaqian Wang
Abstract
Huaqian Wang
Abstract
The author discusses the pile deviation error control,mud and bored quality control,reinforcing cage and underwater concrete grouting quality control in the bored pile construction,points out that only enhancing the quality control on these links,we can ensure the pile quality of the bored pile and safety of the pile foundation.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The author discusses the pile deviation error control,mud and bored quality control,reinforcing cage and underwater concrete grouting quality control in the bored pile construction,points out that only enhancing the quality control on these links,we can ensure the pile quality of the bored pile and safety of the pile foundation.
Key concepts: Pile, Foundation (evidence), Quality (philosophy), Control (management), Engineering, Geotechnical engineering, Forensic engineering, Computer science