2010The World of Building MaterialsRequires access

Construction Management of the Railway Bridge Drilled Pile

Jiang Yong-chun

Open publisher page 0 citations

Abstract

In recent years,with the development of traffic engineering,more and more railway construction project were built,the construction standard are required higher and higher.Bridge construction is the best crux of the whole route and the foundation engineering is the crux of the bridge construction.The thesis introduced the drilled pile foundation construction technique and analyses it's FAQ and treatment for reference.

About this research paper

What this paper is about

In recent years,with the development of traffic engineering,more and more railway construction project were built,the construction standard are required higher and higher.Bridge construction is the best crux of the whole route and the foundation engineering is the crux of the bridge construction.The thesis introduced the drilled pile foundation construction technique and analyses it's FAQ and treatment for reference.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In recent years,with the development of traffic engineering,more and more railway construction project were built,the construction standard are required higher and higher.Bridge construction is the best crux of the whole route and the foundation engineering is the crux of the bridge construction.The thesis introduced the drilled pile foundation construction technique and analyses it's FAQ and treatment for reference.

Key concepts: Pile, Bridge (graph theory), Foundation (evidence), Engineering, Civil engineering, Construction management, Pile cap, Construction engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction Management of the Railway Bridge Drilled Pile — Research Paper | ScholarLens