Study of Design and Calculation Method on Double-row Drilling Anti-slide Piles

Wen Xiang-h

Open publisher page 0 citations

Abstract

Double-row anti-sliding piles have been used in the landslide,but its calculation theory is lack of consensus. Double-row drilling anti-sliding piles mainly bear landslide thrust,piles vertical deformation can be thought of as zero,based on the bridge multi-row foundation piles internal force and displacement calculation theory,the displacement method is ternary linear equation reduced to two linear equation group,stiffness coefficient was reduced from 9 to 4,in order to simplify the solution of pile body internal force and displacement. Based on the bridge theoretical calculation of pile,cushion cap and engineering example,the establishment of Double-row anti-sliding piles approximate formula for calculating the height of the coupling beam when the beam rigid,and recommended reduction multiplied by 0. 7 to0. 9 when calculating the coupling beam height. The application in the engineering practice found: in the landslide thrust is large,using Double-row drilling anti-sliding piles construction progress faster than single row of piles,good safety and lower cost; This method compared with the rigid frame model calculation method,found that the calculation results of rigid frame model tend to be conservative,the pile supporting conditions of different calculation results is difference larger,when used as embedded segment of rock hard and embedded deep,complete suggestion according to fixed bearing processing,when the built-in embedded rock complete but not deep or embedded deep but rock weathering broken serious,hinged support treatment is recommended.

About this research paper

What this paper is about

Double-row anti-sliding piles have been used in the landslide,but its calculation theory is lack of consensus. Double-row drilling anti-sliding piles mainly bear landslide thrust,piles vertical deformation can be thought of as zero,based on the bridge multi-row foundation piles internal force and displacement calculation theory,the displacement method is ternary linear equation reduced to two linear equation group,stiffness coefficient was reduced from 9 to 4,in order to simplify the solution of pile body internal force and displacement. Based on the bridge theoretical calculation of pile,cushion cap and engineering example,the establishment of Double-row anti-sliding piles approximate formula for calculating the height of the coupling beam when the beam rigid,and recommended reduction multiplied by 0. 7 to0. 9 when calculating the coupling beam height. The application in the engineering practice found: in the landslide thrust is large,using Double-row drilling anti-sliding piles construction progress faster than single row of piles,good safety and lower cost; This method compared with the rigid frame model calculation method,found that the calculation results of rigid frame model tend to be conservative,the pile supporting conditions of different calculation results is difference larger,when used as embedded segment of rock hard and embedded deep,complete suggestion according to fixed bearing processing,when the built-in embedded rock complete but not deep or embedded deep but rock weathering broken serious,hinged support treatment is recommended.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Double-row anti-sliding piles have been used in the landslide,but its calculation theory is lack of consensus. Double-row drilling anti-sliding piles mainly bear landslide thrust,piles vertical deformation can be thought of as zero,based on the bridge multi-row foundation piles internal force and displacement calculation theory,the displacement method is ternary linear equation reduced to two linear equation group,stiffness coefficient was reduced from 9 to 4,in order to simplify the solution of pile body internal force and displacement. Based on the bridge theoretical calculation of pile,cushion cap and engineering example,the establishment of Double-row anti-sliding piles approximate formula for calculating the height of the coupling beam when the beam rigid,and recommended reduction multiplied by 0. 7 to0. 9 when calculating the coupling beam height. The application in the engineering practice found: in the landslide thrust is large,using Double-row drilling anti-sliding piles construction progress faster than single row of piles,good safety and lower cost; This method compared with the rigid frame model calculation method,found that the calculation results of rigid frame model tend to be conservative,the pile supporting conditions of different calculation results is difference larger,when used as embedded segment of rock hard and embedded deep,complete suggestion according to fixed bearing processing,when the built-in embedded rock complete but not deep or embedded deep but rock weathering broken serious,hinged support treatment is recommended.

Key concepts: Pile, Thrust, Structural engineering, Stiffness, Displacement (psychology), Geotechnical engineering, Beam (structure), Foundation (evidence)

Related papers

Back to paper searchBrowse research topicsOriginal source
Study of Design and Calculation Method on Double-row Drilling Anti-slide Piles — Research Paper | ScholarLens