2009Shanxi ArchitectureRequires access

Construction quality control of highway subgrade earth-rock filling

Wang Guo-lian

Open publisher page 0 citations

Abstract

The author describes on how to enhance the quality control of the highway subgrade earth-rock filling construction mainly from aspect of reasonably selecting filling material,construction controlling index,field construction process quality control,quality acceptance,subgrade filling after the bridge culvert and the deep groove high filling subgrade filling quality control,so as to ensure subgrade construction quality.

About this research paper

What this paper is about

The author describes on how to enhance the quality control of the highway subgrade earth-rock filling construction mainly from aspect of reasonably selecting filling material,construction controlling index,field construction process quality control,quality acceptance,subgrade filling after the bridge culvert and the deep groove high filling subgrade filling quality control,so as to ensure subgrade construction quality.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The author describes on how to enhance the quality control of the highway subgrade earth-rock filling construction mainly from aspect of reasonably selecting filling material,construction controlling index,field construction process quality control,quality acceptance,subgrade filling after the bridge culvert and the deep groove high filling subgrade filling quality control,so as to ensure subgrade construction quality.

Key concepts: Subgrade, Geotechnical engineering, Quality (philosophy), Engineering, Bridge (graph theory), Culvert, Civil engineering, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction quality control of highway subgrade earth-rock filling — Research Paper | ScholarLens