2006Unpublished venueRequires access

Design and Construction of the Plugged-in ~(22)Na Based Slow Positron Beam Facility

Xingzhong Cao

Open publisher page 0 citations

Abstract

The Beijing intense slow positron beam facility has restricted running time of the BEPC-LINAC designed for BES and BSRF operation, We have therefore designed and constructed the plugged-in 22Na based slow positron beam section in the Beijing intense slow positron beam line with which we can supply continuous slow positron beam for debugging of newly-built positron annihilation measurement systems and saving running time of the Beijing intense slow positron beam. The plugged-in 22Na based slow positron beam section includes positron source(22Na), positron moderator, E×B slow positron energy filter, multilevel electrostatic acceleration tube, radioprotection, magnetic transport system and vacuum system, etc. The new slow positron beam line will be running on April, 2006.

About this research paper

What this paper is about

The Beijing intense slow positron beam facility has restricted running time of the BEPC-LINAC designed for BES and BSRF operation, We have therefore designed and constructed the plugged-in 22Na based slow positron beam section in the Beijing intense slow positron beam line with which we can supply continuous slow positron beam for debugging of newly-built positron annihilation measurement systems and saving running time of the Beijing intense slow positron beam. The plugged-in 22Na based slow positron beam section includes positron source(22Na), positron moderator, E×B slow positron energy filter, multilevel electrostatic acceleration tube, radioprotection, magnetic transport system and vacuum system, etc. The new slow positron beam line will be running on April, 2006.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Beijing intense slow positron beam facility has restricted running time of the BEPC-LINAC designed for BES and BSRF operation, We have therefore designed and constructed the plugged-in 22Na based slow positron beam section in the Beijing intense slow positron beam line with which we can supply continuous slow positron beam for debugging of newly-built positron annihilation measurement systems and saving running time of the Beijing intense slow positron beam. The plugged-in 22Na based slow positron beam section includes positron source(22Na), positron moderator, E×B slow positron energy filter, multilevel electrostatic acceleration tube, radioprotection, magnetic transport system and vacuum system, etc. The new slow positron beam line will be running on April, 2006.

Key concepts: Positron, Physics, Beam (structure), Nuclear physics, Beamline, Linear particle accelerator, Optics, Electron

Related papers

Back to paper searchBrowse research topicsOriginal source
Design and Construction of the Plugged-in ~(22)Na Based Slow Positron Beam Facility — Research Paper | ScholarLens