Treatment of domestic sewage with integrated ABR and constructed wetland process

Du Jiawei

Open publisher page 0 citations

Abstract

The combined process of anaerobic baffled reactor and constructed wetland was used to treat domestic sewage.The results showed that the optimum HRT for ABR was 12 hours and the average removal efficiency was 76%,while the HRT for constructed wetland was 4 days.The combined process showed excellent removal efficiency with COD 89%,BOD5 95%,SS above 95% and ammonia nitrogen 66.8%,and the effluent concentrations of COD,BOD5,SS and ammonia nitrogen were 42-51 mg·L-1,11.2 mg·L-1,9.1 mg·L-1 and 15 mg·L-1,respectively.Which could meet the I-class B criteria specified in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB18918-2002).These results may provide useful information to the potential applications of the combined process of ABR and constructed wetland for sewage treatment at rural areas.

About this research paper

What this paper is about

The combined process of anaerobic baffled reactor and constructed wetland was used to treat domestic sewage.The results showed that the optimum HRT for ABR was 12 hours and the average removal efficiency was 76%,while the HRT for constructed wetland was 4 days.The combined process showed excellent removal efficiency with COD 89%,BOD5 95%,SS above 95% and ammonia nitrogen 66.8%,and the effluent concentrations of COD,BOD5,SS and ammonia nitrogen were 42-51 mg·L-1,11.2 mg·L-1,9.1 mg·L-1 and 15 mg·L-1,respectively.Which could meet the I-class B criteria specified in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB18918-2002).These results may provide useful information to the potential applications of the combined process of ABR and constructed wetland for sewage treatment at rural areas.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The combined process of anaerobic baffled reactor and constructed wetland was used to treat domestic sewage.The results showed that the optimum HRT for ABR was 12 hours and the average removal efficiency was 76%,while the HRT for constructed wetland was 4 days.The combined process showed excellent removal efficiency with COD 89%,BOD5 95%,SS above 95% and ammonia nitrogen 66.8%,and the effluent concentrations of COD,BOD5,SS and ammonia nitrogen were 42-51 mg·L-1,11.2 mg·L-1,9.1 mg·L-1 and 15 mg·L-1,respectively.Which could meet the I-class B criteria specified in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant(GB18918-2002).These results may provide useful information to the potential applications of the combined process of ABR and constructed wetland for sewage treatment at rural areas.

Key concepts: Effluent, Sewage, Wetland, Wastewater, Sewage treatment, Environmental science, Constructed wetland, Pollutant