Study on Development Height of Water Flow Crack Zone in Roof Above Fully Mechanized One Passing Full Seam Mining Face
Shangxian Yin
Abstract
Shangxian Yin
Abstract
In order to prevent and control the roof water,to leave the water prevention coal pillars,rationally set the height of the three zones in the roof,taking No.8 seam in Chengdi Mine of Xishan Town as a study object,an underground mine water injection leakage measuring method with overhead borehole and a transient electromagnetic method were applied to measure the height of the water flow crack zone.The FLAC3D software was applied to the numerical simulation on the roof falling of the overburden strata and the strata migration law.The results showed that the water flow crack zone height of the numerical simulation and the site measurement was basically the same.The water flow crack zone height was set as 57.58 m,the falling zone height was 16.32 m and the crack zone height was 41.26 m.Thus the statistic experience formula of the water flow crack zone stipulated in Mine Safety Regulations would be not suitable for the mining conditions of the fully mechanized one passing full seam mining face in the medium thick seam.
OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In order to prevent and control the roof water,to leave the water prevention coal pillars,rationally set the height of the three zones in the roof,taking No.8 seam in Chengdi Mine of Xishan Town as a study object,an underground mine water injection leakage measuring method with overhead borehole and a transient electromagnetic method were applied to measure the height of the water flow crack zone.The FLAC3D software was applied to the numerical simulation on the roof falling of the overburden strata and the strata migration law.The results showed that the water flow crack zone height of the numerical simulation and the site measurement was basically the same.The water flow crack zone height was set as 57.58 m,the falling zone height was 16.32 m and the crack zone height was 41.26 m.Thus the statistic experience formula of the water flow crack zone stipulated in Mine Safety Regulations would be not suitable for the mining conditions of the fully mechanized one passing full seam mining face in the medium thick seam.
Key concepts: Roof, Borehole, Overburden, Coal mining, Geology, Mining engineering, Geotechnical engineering, Computer simulation