2006Petroleum Geology & Oilfield Development in DaqingRequires access

Application of Pre-fracturing Evaluation for Fracturing Well in Block Gu-137 of Puxi Oilfield

Zhixiang Zhang

Open publisher page 0 citations

Abstract

As post-fracturing production of Block Gu-137 in Puxi Oilfield could not meet the economic development standards of fracturing production,this paper analyzed and appraised the reason for past inefficient fracturing from three factors influencing hydraulic fracture height,including fracturing fluid system,proppant optimization and ground stress on vertical section.Through optimization of above factors,we determined fracturing operation scale,increased the near well bore diversion ability according with the fracturing design of operation parameters under the idea oftwo low and two high,which can enhance flow back rate of fracturing fluid with capsule breaker and binary breaker system used to trace conventional breaker,and decrease damage of fracturing fluid to reservoir and fracture flow conductivity.On-site fracturing test for 11 wells was performed at the end of 2004 and it has obtained pretty good results,proving the necessary technology guarantee for the sequent fracturing of development well in this block.

About this research paper

What this paper is about

As post-fracturing production of Block Gu-137 in Puxi Oilfield could not meet the economic development standards of fracturing production,this paper analyzed and appraised the reason for past inefficient fracturing from three factors influencing hydraulic fracture height,including fracturing fluid system,proppant optimization and ground stress on vertical section.Through optimization of above factors,we determined fracturing operation scale,increased the near well bore diversion ability according with the fracturing design of operation parameters under the idea oftwo low and two high,which can enhance flow back rate of fracturing fluid with capsule breaker and binary breaker system used to trace conventional breaker,and decrease damage of fracturing fluid to reservoir and fracture flow conductivity.On-site fracturing test for 11 wells was performed at the end of 2004 and it has obtained pretty good results,proving the necessary technology guarantee for the sequent fracturing of development well in this block.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

As post-fracturing production of Block Gu-137 in Puxi Oilfield could not meet the economic development standards of fracturing production,this paper analyzed and appraised the reason for past inefficient fracturing from three factors influencing hydraulic fracture height,including fracturing fluid system,proppant optimization and ground stress on vertical section.Through optimization of above factors,we determined fracturing operation scale,increased the near well bore diversion ability according with the fracturing design of operation parameters under the idea oftwo low and two high,which can enhance flow back rate of fracturing fluid with capsule breaker and binary breaker system used to trace conventional breaker,and decrease damage of fracturing fluid to reservoir and fracture flow conductivity.On-site fracturing test for 11 wells was performed at the end of 2004 and it has obtained pretty good results,proving the necessary technology guarantee for the sequent fracturing of development well in this block.

Key concepts: Hydraulic fracturing, Fracturing fluid, Petroleum engineering, Geology, Fracture (geology), Fault block, Block (permutation group theory), Tight gas

Related papers

Back to paper searchBrowse research topicsOriginal source
Application of Pre-fracturing Evaluation for Fracturing Well in Block Gu-137 of Puxi Oilfield — Research Paper | ScholarLens