2013•Power System TechnologyRequires access

A Model to Analyze Peak Load Regulation of Provincial Power System Considering Sending-out of Wind Power

Jingli Guo

Open publisher page 4 citations

Abstract

The intermittence and peak load counterregulation effect of wind power make the provincial power grids located in the provinces rich in wind resource having to be forced with the problems of peak load regulation and accommodation of massive wind power,and to solve the problem of accommodating massive wind power it is effective to construct high-capacity transmission line to send out wind power.To cope with the effects of post-construction of transmission line to send out wind power on system peak load regulation and accommodation of wind power,a model to analyze peak load regulation of provincial power system considering sending-out of wind power,in which the sending-out of wind power is considered,is built.Taking the prediction of wind power output into account and based on original load,a new equivalent load,in which the wind power output is regarded as negative load,is formed;then considering the peak load shifting effect of hydropower generating units and the auxiliary load regulation effect of transmission line sending power out,a model to arrange output of regular power units in the whole provincial power grid is established,and on this basis the peak load regulation of the provincial power grid is analyzed.Taking a provincial power grid in China that is rich in wind energy source as example,the simulation analysis is performed,and simulation results show that the construction of transmission line to send out wind power can reduced the abandoned wind energy and the ability of accommodating wind power is enhanced,in addition,the peak load regulation at both sending end and receiving end can be complementary,thus it is proved that the proposed suggestion is favorable to the sustainable development of wind power base.

About this research paper

What this paper is about

The intermittence and peak load counterregulation effect of wind power make the provincial power grids located in the provinces rich in wind resource having to be forced with the problems of peak load regulation and accommodation of massive wind power,and to solve the problem of accommodating massive wind power it is effective to construct high-capacity transmission line to send out wind power.To cope with the effects of post-construction of transmission line to send out wind power on system peak load regulation and accommodation of wind power,a model to analyze peak load regulation of provincial power system considering sending-out of wind power,in which the sending-out of wind power is considered,is built.Taking the prediction of wind power output into account and based on original load,a new equivalent load,in which the wind power output is regarded as negative load,is formed;then considering the peak load shifting effect of hydropower generating units and the auxiliary load regulation effect of transmission line sending power out,a model to arrange output of regular power units in the whole provincial power grid is established,and on this basis the peak load regulation of the provincial power grid is analyzed.Taking a provincial power grid in China that is rich in wind energy source as example,the simulation analysis is performed,and simulation results show that the construction of transmission line to send out wind power can reduced the abandoned wind energy and the ability of accommodating wind power is enhanced,in addition,the peak load regulation at both sending end and receiving end can be complementary,thus it is proved that the proposed suggestion is favorable to the sustainable development of wind power base.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The intermittence and peak load counterregulation effect of wind power make the provincial power grids located in the provinces rich in wind resource having to be forced with the problems of peak load regulation and accommodation of massive wind power,and to solve the problem of accommodating massive wind power it is effective to construct high-capacity transmission line to send out wind power.To cope with the effects of post-construction of transmission line to send out wind power on system peak load regulation and accommodation of wind power,a model to analyze peak load regulation of provincial power system considering sending-out of wind power,in which the sending-out of wind power is considered,is built.Taking the prediction of wind power output into account and based on original load,a new equivalent load,in which the wind power output is regarded as negative load,is formed;then considering the peak load shifting effect of hydropower generating units and the auxiliary load regulation effect of transmission line sending power out,a model to arrange output of regular power units in the whole provincial power grid is established,and on this basis the peak load regulation of the provincial power grid is analyzed.Taking a provincial power grid in China that is rich in wind energy source as example,the simulation analysis is performed,and simulation results show that the construction of transmission line to send out wind power can reduced the abandoned wind energy and the ability of accommodating wind power is enhanced,in addition,the peak load regulation at both sending end and receiving end can be complementary,thus it is proved that the proposed suggestion is favorable to the sustainable development of wind power base.

Key concepts: Wind power, Base load power plant, Power (physics), Electric power system, Power optimizer, Electric power transmission, Automotive engineering, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
A Model to Analyze Peak Load Regulation of Provincial Power System Considering Sending-out of Wind Power — Research Paper | ScholarLens