2011•Northeast Electric Power TechnologyRequires access

Research on Daily Optimal Operation for Cascaded Hydropower Stations

Zhang Xueyuan

Open publisher page 0 citations

Abstract

The equal incremental principle for hydro and thermal scheduling is derived,the physical meaning and influencing factors of attached modulus are analyzed.The influence on hydraulic stations daily optimal operation of upstream water level fluctuation and flow time-delay are analyzed,and calculation method which is used for hydropower stations daily optimal operation considering upstream water level fluctuation and flow time-delay is proposed.

About this research paper

What this paper is about

The equal incremental principle for hydro and thermal scheduling is derived,the physical meaning and influencing factors of attached modulus are analyzed.The influence on hydraulic stations daily optimal operation of upstream water level fluctuation and flow time-delay are analyzed,and calculation method which is used for hydropower stations daily optimal operation considering upstream water level fluctuation and flow time-delay is proposed.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The equal incremental principle for hydro and thermal scheduling is derived,the physical meaning and influencing factors of attached modulus are analyzed.The influence on hydraulic stations daily optimal operation of upstream water level fluctuation and flow time-delay are analyzed,and calculation method which is used for hydropower stations daily optimal operation considering upstream water level fluctuation and flow time-delay is proposed.

Key concepts: Hydropower, Upstream (networking), Scheduling (production processes), Environmental science, Flow (mathematics), Thermal, Control theory (sociology), Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on Daily Optimal Operation for Cascaded Hydropower Stations — Research Paper | ScholarLens