2003Engineering of Surveying and MappingRequires access

Analysis and surveying of construction control network for the north bridge of Runyang bridge

Dehua Zheng

Open publisher page 0 citations

Abstract

Three design schemes of the construction control network for north bridge of Runyang bridge are proposed in the paper.By comparing and analysing the results computed with surveying data,the design of three schemes is proved to be accurate.The practice of the project indicates that the sur-veying method of trilateration network or triangulateration network for large-sized bridge can fulfil the accuracy requirements for construction control network.The post-test method of determining weight is suitable for triangulateration network adjustment.In the triangulateration network adjustment with precise distance measurement,increasing the number of direction observation can't effectively improve the accuracy of control network.

About this research paper

What this paper is about

Three design schemes of the construction control network for north bridge of Runyang bridge are proposed in the paper.By comparing and analysing the results computed with surveying data,the design of three schemes is proved to be accurate.The practice of the project indicates that the sur-veying method of trilateration network or triangulateration network for large-sized bridge can fulfil the accuracy requirements for construction control network.The post-test method of determining weight is suitable for triangulateration network adjustment.In the triangulateration network adjustment with precise distance measurement,increasing the number of direction observation can't effectively improve the accuracy of control network.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Three design schemes of the construction control network for north bridge of Runyang bridge are proposed in the paper.By comparing and analysing the results computed with surveying data,the design of three schemes is proved to be accurate.The practice of the project indicates that the sur-veying method of trilateration network or triangulateration network for large-sized bridge can fulfil the accuracy requirements for construction control network.The post-test method of determining weight is suitable for triangulateration network adjustment.In the triangulateration network adjustment with precise distance measurement,increasing the number of direction observation can't effectively improve the accuracy of control network.

Key concepts: Trilateration, Control network, Bridge (graph theory), Computer science, Control (management), Network planning and design, Transport engineering, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Analysis and surveying of construction control network for the north bridge of Runyang bridge — Research Paper | ScholarLens