Test Study on Lingdingyang Siltation Model
Wu Ming
Abstract
Wu Ming
Abstract
The main feature of siltation model is described and the siltation conditions varying with tidal current before and after the excavation of Lingdingyang East and West Channels are studied.From the result of the First Phase Project and the synthetical analysis of the factors such as current and sediment etc.,it's obtained that to select the West Channel for developing a 35 000 t channel in Guangzhou Port is proper.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The main feature of siltation model is described and the siltation conditions varying with tidal current before and after the excavation of Lingdingyang East and West Channels are studied.From the result of the First Phase Project and the synthetical analysis of the factors such as current and sediment etc.,it's obtained that to select the West Channel for developing a 35 000 t channel in Guangzhou Port is proper.
Key concepts: Siltation, Current (fluid), Channel (broadcasting), Tidal current, Geology, Sediment, Port (circuit theory), Excavation