Research on the Time Sequence of External Railway Rapid Passage Construction in Sichuan

HE Xue-gang

Open publisher page 0 citations

Abstract

Research purposes:On basis of existing railway,under-construction railway and proposed railway,this paper analyses the suitability of Sichuan railway transportation capacity and demand to determine the time sequence of external railway rapid passage construction in Sichuan.Research conclusions:In Sichuan railway construction,we should concentrate onto building the external passage first and later building the internal passage.In proposed railway construction,the double line on the Lanzhou-Chongqing railway and Suining-Chongqing railway will be built immediately.In the plan of railway,the sequence of railway construction is in turn the Chengdu-Kunming railway for raising the speed and transportation capacity,Xi'an-Chengdu passenger dedicated line,Chengdu-Lasha railway,Chengdu-Guiyang railway.The four railways mentioned above will be completed and operated in 2018.

About this research paper

What this paper is about

Research purposes:On basis of existing railway,under-construction railway and proposed railway,this paper analyses the suitability of Sichuan railway transportation capacity and demand to determine the time sequence of external railway rapid passage construction in Sichuan.Research conclusions:In Sichuan railway construction,we should concentrate onto building the external passage first and later building the internal passage.In proposed railway construction,the double line on the Lanzhou-Chongqing railway and Suining-Chongqing railway will be built immediately.In the plan of railway,the sequence of railway construction is in turn the Chengdu-Kunming railway for raising the speed and transportation capacity,Xi'an-Chengdu passenger dedicated line,Chengdu-Lasha railway,Chengdu-Guiyang railway.The four railways mentioned above will be completed and operated in 2018.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Research purposes:On basis of existing railway,under-construction railway and proposed railway,this paper analyses the suitability of Sichuan railway transportation capacity and demand to determine the time sequence of external railway rapid passage construction in Sichuan.Research conclusions:In Sichuan railway construction,we should concentrate onto building the external passage first and later building the internal passage.In proposed railway construction,the double line on the Lanzhou-Chongqing railway and Suining-Chongqing railway will be built immediately.In the plan of railway,the sequence of railway construction is in turn the Chengdu-Kunming railway for raising the speed and transportation capacity,Xi'an-Chengdu passenger dedicated line,Chengdu-Lasha railway,Chengdu-Guiyang railway.The four railways mentioned above will be completed and operated in 2018.

Key concepts: Railway line, Transport engineering, Plan (archaeology), Sequence (biology), Railway system, Engineering, Time sequence, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on the Time Sequence of External Railway Rapid Passage Construction in Sichuan — Research Paper | ScholarLens