2006Sci-Tech Information Development & EconomyRequires access

The Key Techniques for the Construction of Hewu Railway Tunnel

Gao Lian-chen

Open publisher page 0 citations

Abstract

Based on the traditional tunnel construction techniques,and in the light of the features of the tunnel of Wuhe special passenger line,this paper puts forward some corresponding key techniques from the drill blasting,leakage,construction ventilation,and stepped construction,etc.

About this research paper

What this paper is about

Based on the traditional tunnel construction techniques,and in the light of the features of the tunnel of Wuhe special passenger line,this paper puts forward some corresponding key techniques from the drill blasting,leakage,construction ventilation,and stepped construction,etc.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on the traditional tunnel construction techniques,and in the light of the features of the tunnel of Wuhe special passenger line,this paper puts forward some corresponding key techniques from the drill blasting,leakage,construction ventilation,and stepped construction,etc.

Key concepts: Rock blasting, Key (lock), Tunnel construction, Engineering, Drill, Construction engineering, Line (geometry), Forensic engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
The Key Techniques for the Construction of Hewu Railway Tunnel — Research Paper | ScholarLens