Directing against problems of wornout and leakage on economizer of boiler no3 in Tongliao Power Plant, the causes leading to wornout have been analysed, and retrofit of said economizer being carried out. In retrofit, measures of not varying the main body and changing over to use membrane economizer for enhancing wearresistant capability of the heating surface have been taken. Analysis of test results after retrofitting shows that the said retrofitting is successful, having solved the existing problems of leakage, enhancing the stability and economic behavior of the said boiler.

About this research paper

What this paper is about

Directing against problems of wornout and leakage on economizer of boiler no3 in Tongliao Power Plant, the causes leading to wornout have been analysed, and retrofit of said economizer being carried out. In retrofit, measures of not varying the main body and changing over to use membrane economizer for enhancing wearresistant capability of the heating surface have been taken. Analysis of test results after retrofitting shows that the said retrofitting is successful, having solved the existing problems of leakage, enhancing the stability and economic behavior of the said boiler.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Directing against problems of wornout and leakage on economizer of boiler no3 in Tongliao Power Plant, the causes leading to wornout have been analysed, and retrofit of said economizer being carried out. In retrofit, measures of not varying the main body and changing over to use membrane economizer for enhancing wearresistant capability of the heating surface have been taken. Analysis of test results after retrofitting shows that the said retrofitting is successful, having solved the existing problems of leakage, enhancing the stability and economic behavior of the said boiler.

Key concepts: Economizer, Retrofitting, Boiler (water heating), Power station, Engineering, Thermal power station, Waste management, Leakage (economics)