Construction technology summary of cement stabilized macadam base
Dejin Hu
Abstract
Dejin Hu
Abstract
Through the construction practice of cement stabilized subbase,base of a highway LM2 contract section in Shaanxi province,this paper elaborated the determination of each construction parameters of cement stable macadam subbase,base,the processing of paving work,rolling process,vertical and horizontal construction joints,the quality control main points and other aspects,summarized some methods of cement stabilized macadam base construction,provided guidance for similar engineering construction.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Through the construction practice of cement stabilized subbase,base of a highway LM2 contract section in Shaanxi province,this paper elaborated the determination of each construction parameters of cement stable macadam subbase,base,the processing of paving work,rolling process,vertical and horizontal construction joints,the quality control main points and other aspects,summarized some methods of cement stabilized macadam base construction,provided guidance for similar engineering construction.
Key concepts: Subbase, Cement, Base (topology), Work (physics), Civil engineering, Engineering, Process (computing), Computer science