Construction Technology of Water-rich Foundation Pit
Dajian Li
Abstract
Dajian Li
Abstract
The design of enclosure,main construction plan,problems emerge in construction procedure and corresponding countermeasures are expounded detailely.In order to guarantee construction safety,countermeasures which based on synthetically consideration of geological condition and engineering characteristic should be made.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The design of enclosure,main construction plan,problems emerge in construction procedure and corresponding countermeasures are expounded detailely.In order to guarantee construction safety,countermeasures which based on synthetically consideration of geological condition and engineering characteristic should be made.
Key concepts: Foundation (evidence), Engineering, Enclosure, Plan (archaeology), Construction engineering, Civil engineering, Forensic engineering, Geology