Through Survey Method and Error Analysis of Mine Roadway in Large Mine
LI Xing-guo
Abstract
LI Xing-guo
Abstract
In order to improve the accuracy and reliability of the through survey for a mine roadway,a rational survey plan should be prepared and an effective survey method should be conducted.In combination with the project cases,the paper analyzed the surface ground control network,underground traverse survey,mine shaft orientation and gyro orientation edge survey influenced to the through accuracy of the mine roadway.The paper discussed the feasibility method to improve the measuring accuracy.With the prediction and analysis on the error of the through survey,the predicted ultra error between the two central lines in the through point was ± 304 mm and the predicted ultra error of the two grade lines was ± 184 mm,which could meet the Mine Survey Regulations and construction requirements and could verify the rationality of the selected survey plan and method.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In order to improve the accuracy and reliability of the through survey for a mine roadway,a rational survey plan should be prepared and an effective survey method should be conducted.In combination with the project cases,the paper analyzed the surface ground control network,underground traverse survey,mine shaft orientation and gyro orientation edge survey influenced to the through accuracy of the mine roadway.The paper discussed the feasibility method to improve the measuring accuracy.With the prediction and analysis on the error of the through survey,the predicted ultra error between the two central lines in the through point was ± 304 mm and the predicted ultra error of the two grade lines was ± 184 mm,which could meet the Mine Survey Regulations and construction requirements and could verify the rationality of the selected survey plan and method.
Key concepts: Traverse, Reliability (semiconductor), Survey methodology, Plan (archaeology), Wireless site survey, Enhanced Data Rates for GSM Evolution, Point (geometry), Engineering