Monitoring analysis on the seepage at curtain zone in permanent ship lock of TGP
Zhicheng Zhang
Abstract
Zhicheng Zhang
Abstract
Anti-seepage at the permanent ship lock foundation is the key part in the whole closed proof system in the Three Gorge Project.The monitoring results have shown that water level behind foundation curtain was lower than that in reservoir and has been effected less.The reduction factor of seepage pressure is less than design value.The underground water level at the two sides of mountain higher than that in reservoir matched the location topography,and has closed relationship with the rainfall.Each measuring point changed periodically.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Anti-seepage at the permanent ship lock foundation is the key part in the whole closed proof system in the Three Gorge Project.The monitoring results have shown that water level behind foundation curtain was lower than that in reservoir and has been effected less.The reduction factor of seepage pressure is less than design value.The underground water level at the two sides of mountain higher than that in reservoir matched the location topography,and has closed relationship with the rainfall.Each measuring point changed periodically.
Key concepts: Foundation (evidence), Lock (firearm), Geotechnical engineering, Geology, Water level, Groundwater, Engineering, Structural engineering