The layout of drill hole and the determination of parameter in advanced water injection to prevent rockburst from occurring

Zhang Zhi-hui

Open publisher page 5 citations

Abstract

The previous water injection into coal seam was applied when the tunnel was digged in order to solve the rockburst problem of Muchengjian Mine.The single drill hole isobaric water injection was put into effect on site in 6178 digging working face of this coal mine and the water increment around the drill hole was measured, then the model parameter was inversed by using variable-tolerance-band optimization search method and the water transmission and storage characteristic parameter was obtained, which showed that this coal seam had bad water transmissibility and belonged to low-wetted saturation, so the high-pressure (9~12 MPa) water injection suited it.The dynamic changing process of water injection under different kinds of pressure was described by numerical simulation in detail.The dynamic variable relation among pressure-time-wetted perimeter of water injection was formulated.The changing relation between the layout of single,double drill hole and water injection parameter was analyzed.The method of water injection using double drill hole and scheme which adopts double digging woking surface,that is water injection and digging are carried out alternately, which not only enlarges the wetted zero but also water injection does not affect digging work .The reasonable water injection parameter was also presented.

About this research paper

What this paper is about

The previous water injection into coal seam was applied when the tunnel was digged in order to solve the rockburst problem of Muchengjian Mine.The single drill hole isobaric water injection was put into effect on site in 6178 digging working face of this coal mine and the water increment around the drill hole was measured, then the model parameter was inversed by using variable-tolerance-band optimization search method and the water transmission and storage characteristic parameter was obtained, which showed that this coal seam had bad water transmissibility and belonged to low-wetted saturation, so the high-pressure (9~12 MPa) water injection suited it.The dynamic changing process of water injection under different kinds of pressure was described by numerical simulation in detail.The dynamic variable relation among pressure-time-wetted perimeter of water injection was formulated.The changing relation between the layout of single,double drill hole and water injection parameter was analyzed.The method of water injection using double drill hole and scheme which adopts double digging woking surface,that is water injection and digging are carried out alternately, which not only enlarges the wetted zero but also water injection does not affect digging work .The reasonable water injection parameter was also presented.

Why it matters

OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The previous water injection into coal seam was applied when the tunnel was digged in order to solve the rockburst problem of Muchengjian Mine.The single drill hole isobaric water injection was put into effect on site in 6178 digging working face of this coal mine and the water increment around the drill hole was measured, then the model parameter was inversed by using variable-tolerance-band optimization search method and the water transmission and storage characteristic parameter was obtained, which showed that this coal seam had bad water transmissibility and belonged to low-wetted saturation, so the high-pressure (9~12 MPa) water injection suited it.The dynamic changing process of water injection under different kinds of pressure was described by numerical simulation in detail.The dynamic variable relation among pressure-time-wetted perimeter of water injection was formulated.The changing relation between the layout of single,double drill hole and water injection parameter was analyzed.The method of water injection using double drill hole and scheme which adopts double digging woking surface,that is water injection and digging are carried out alternately, which not only enlarges the wetted zero but also water injection does not affect digging work .The reasonable water injection parameter was also presented.

Key concepts: Coal mining, Drill, Digging, Water injection (oil production), Drill hole, Coal, Petroleum engineering, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
The layout of drill hole and the determination of parameter in advanced water injection to prevent rockburst from occurring — Research Paper | ScholarLens