2013Port & Waterway EngineeringRequires access

Opportunity, challenge and measure of Yangtze estuary waterway in the period of post 12.5-meter navigation channel

Zhenzhen Wang

Open publisher page 0 citations

Abstract

Due to Yangtze Estuary Deepwater Channel Regulation Project with 40 years of research and 13 years of construction,the 12.5-meter-deep waterway was officially navigational in May 2011,and thus the pattern of Yangtze estuary waterway system had a historic change and stepped into the period of post 12.5-meter navigation channel.Based on analysis of current situation and problems of Yangtze estuary waterway,various kinds of opportunities and challenges of Yangtze estuary waterway in the period of post 12.5-meter navigation channel are discussed,and relevant channel regulation measures are preliminarily presented.

About this research paper

What this paper is about

Due to Yangtze Estuary Deepwater Channel Regulation Project with 40 years of research and 13 years of construction,the 12.5-meter-deep waterway was officially navigational in May 2011,and thus the pattern of Yangtze estuary waterway system had a historic change and stepped into the period of post 12.5-meter navigation channel.Based on analysis of current situation and problems of Yangtze estuary waterway,various kinds of opportunities and challenges of Yangtze estuary waterway in the period of post 12.5-meter navigation channel are discussed,and relevant channel regulation measures are preliminarily presented.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Due to Yangtze Estuary Deepwater Channel Regulation Project with 40 years of research and 13 years of construction,the 12.5-meter-deep waterway was officially navigational in May 2011,and thus the pattern of Yangtze estuary waterway system had a historic change and stepped into the period of post 12.5-meter navigation channel.Based on analysis of current situation and problems of Yangtze estuary waterway,various kinds of opportunities and challenges of Yangtze estuary waterway in the period of post 12.5-meter navigation channel are discussed,and relevant channel regulation measures are preliminarily presented.

Key concepts: Estuary, Channel (broadcasting), Metre, Period (music), Current meter, Yangtze river, Environmental science, Hydrology (agriculture)

Related papers

Back to paper searchBrowse research topicsOriginal source
Opportunity, challenge and measure of Yangtze estuary waterway in the period of post 12.5-meter navigation channel — Research Paper | ScholarLens