2007•Tiedao gongcheng xuebaoRequires access

Research on the Design for Laying Equipment of Ballastless Track

Xiaogang Li

Open publisher page 0 citations

Abstract

Research purposes:Aiming at the requirements for the building of passenger dedicated railway line, some construction equipments of ballastless track are researched and designed. Research results:A kind of ballastless track laying device with complete function,high adaptation,low cost and easy operation has been developed and manufactured,which can satisfy the construction requirements, guarantee the construction quality and improve the working efficiency for laying track slab,double-slab tie, track panel and some components of switch on the subgrade and bridge and in the tunnel of railway passenger dedicated line.

About this research paper

What this paper is about

Research purposes:Aiming at the requirements for the building of passenger dedicated railway line, some construction equipments of ballastless track are researched and designed. Research results:A kind of ballastless track laying device with complete function,high adaptation,low cost and easy operation has been developed and manufactured,which can satisfy the construction requirements, guarantee the construction quality and improve the working efficiency for laying track slab,double-slab tie, track panel and some components of switch on the subgrade and bridge and in the tunnel of railway passenger dedicated line.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Research purposes:Aiming at the requirements for the building of passenger dedicated railway line, some construction equipments of ballastless track are researched and designed. Research results:A kind of ballastless track laying device with complete function,high adaptation,low cost and easy operation has been developed and manufactured,which can satisfy the construction requirements, guarantee the construction quality and improve the working efficiency for laying track slab,double-slab tie, track panel and some components of switch on the subgrade and bridge and in the tunnel of railway passenger dedicated line.

Key concepts: Laying, Track (disk drive), Slab, Bridge (graph theory), Subgrade, Engineering, Line (geometry), Dedicated line

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on the Design for Laying Equipment of Ballastless Track — Research Paper | ScholarLens