2010•Machine Tool Electric ApparatusRequires access

Applied PLC and inverter to bridge crane trolley walking control system

Liu Jian-chun

Open publisher page 0 citations

Abstract

PLC and inverter were applied in bridge crane trolley walking control system that with advantages of reduction of system hardware and control lines,energy saving,reducing wearing out of mechanical,good start characteristic,etc.The operation control system hardware of bridge crane with PLC and inverter,and the system software implementation were introduced.

About this research paper

What this paper is about

PLC and inverter were applied in bridge crane trolley walking control system that with advantages of reduction of system hardware and control lines,energy saving,reducing wearing out of mechanical,good start characteristic,etc.The operation control system hardware of bridge crane with PLC and inverter,and the system software implementation were introduced.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

PLC and inverter were applied in bridge crane trolley walking control system that with advantages of reduction of system hardware and control lines,energy saving,reducing wearing out of mechanical,good start characteristic,etc.The operation control system hardware of bridge crane with PLC and inverter,and the system software implementation were introduced.

Key concepts: Inverter, Bridge (graph theory), Control system, Engineering, Software, H bridge, Control (management), Control engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Applied PLC and inverter to bridge crane trolley walking control system — Research Paper | ScholarLens