2011The World of Building MaterialsRequires access

Rail line 4II Geological Conditions in the Second Phase of the Project Contract

Xie Zhi-jun

Open publisher page 0 citations

Abstract

This paper presented the general situation and the engineering conditions of the second period of the fourth line of Wuhan metro,analyzed engineering geological problems in subway construction and the influence to the subway construction caused by earthquake,atmosphere hydrology and studied the mechanical properties of rock-soil by doing a series of experiments to meet the needs of design and construction.These problems were discussed and the countermeasures were given.It was proved by practices that it was vitally important for the reconnaissance and constructional plan to recognize the engineering geological problems clearly and make scientific evaluations.

About this research paper

What this paper is about

This paper presented the general situation and the engineering conditions of the second period of the fourth line of Wuhan metro,analyzed engineering geological problems in subway construction and the influence to the subway construction caused by earthquake,atmosphere hydrology and studied the mechanical properties of rock-soil by doing a series of experiments to meet the needs of design and construction.These problems were discussed and the countermeasures were given.It was proved by practices that it was vitally important for the reconnaissance and constructional plan to recognize the engineering geological problems clearly and make scientific evaluations.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper presented the general situation and the engineering conditions of the second period of the fourth line of Wuhan metro,analyzed engineering geological problems in subway construction and the influence to the subway construction caused by earthquake,atmosphere hydrology and studied the mechanical properties of rock-soil by doing a series of experiments to meet the needs of design and construction.These problems were discussed and the countermeasures were given.It was proved by practices that it was vitally important for the reconnaissance and constructional plan to recognize the engineering geological problems clearly and make scientific evaluations.

Key concepts: Plan (archaeology), Civil engineering, Line (geometry), Engineering, Construction engineering, Geology, Mathematics, Paleontology

Related papers

Back to paper searchBrowse research topicsOriginal source
Rail line 4II Geological Conditions in the Second Phase of the Project Contract — Research Paper | ScholarLens