2003Unpublished venueRequires access

Validation Tests of The Hypersim Digital Real Time Simulator with a Large AC-DC Network

Daniel Paré, Gilbert Turmel, V. Q., S. Casoria, Mathew Ward Bissonnette, Beth C. Marcoux, D. McNabb

Open publisher page 34 citations

Abstract

Hydro-Quebec (HQ) had used for many years a very large hybrid simulator for studying various aspects of its power system network. New developments on its network requires to expand and maintain the simulation facilities,and with the development success of Hypersim digital simulator,it was decided to use this technology to gradually replace the hybrid simulator. This paper presents the development and validation of this large scale digital simulator for AC and DC power system performance studies. Validation tests are performed with a relatively large AC-DC interconnected network including generators (turbine,AVR),dynamic loads and a full bipole HVDC transmission system. The network is simulated on both Hypersim real-time simulator and on the hybrid simulator,it is connected with the real external HVDC controls. Comparison of simulation results obtained with Hypersim and with the hybrid simulator are presented. The benefits of precision valve model as well as the effect of the simulation time step will also been discussed. Keywords - Power System real time simulation, HVDC control testing, Hypersim

About this research paper

What this paper is about

Hydro-Quebec (HQ) had used for many years a very large hybrid simulator for studying various aspects of its power system network. New developments on its network requires to expand and maintain the simulation facilities,and with the development success of Hypersim digital simulator,it was decided to use this technology to gradually replace the hybrid simulator. This paper presents the development and validation of this large scale digital simulator for AC and DC power system performance studies. Validation tests are performed with a relatively large AC-DC interconnected network including generators (turbine,AVR),dynamic loads and a full bipole HVDC transmission system. The network is simulated on both Hypersim real-time simulator and on the hybrid simulator,it is connected with the real external HVDC controls. Comparison of simulation results obtained with Hypersim and with the hybrid simulator are presented. The benefits of precision valve model as well as the effect of the simulation time step will also been discussed. Keywords - Power System real time simulation, HVDC control testing, Hypersim

Why it matters

OpenAlex reports 34 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Hydro-Quebec (HQ) had used for many years a very large hybrid simulator for studying various aspects of its power system network. New developments on its network requires to expand and maintain the simulation facilities,and with the development success of Hypersim digital simulator,it was decided to use this technology to gradually replace the hybrid simulator. This paper presents the development and validation of this large scale digital simulator for AC and DC power system performance studies. Validation tests are performed with a relatively large AC-DC interconnected network including generators (turbine,AVR),dynamic loads and a full bipole HVDC transmission system. The network is simulated on both Hypersim real-time simulator and on the hybrid simulator,it is connected with the real external HVDC controls. Comparison of simulation results obtained with Hypersim and with the hybrid simulator are presented. The benefits of precision valve model as well as the effect of the simulation time step will also been discussed. Keywords - Power System real time simulation, HVDC control testing, Hypersim

Key concepts: Real Time Digital Simulator, Power system simulator for engineering, Simulation, Network simulation, Real-time simulation, Computer architecture simulator, Computer science, Turbine

Related papers

Back to paper searchBrowse research topicsOriginal source
Validation Tests of The Hypersim Digital Real Time Simulator with a Large AC-DC Network — Research Paper | ScholarLens