A planning model for lot production on short planning horizon.
Takayoshi Tamura
Abstract
Open-access reader
Takayoshi Tamura
Abstract
Open-access reader
This paper studies the short-range production planning for a machine shop required to produce many different items so as to remain within capacity limitation. A new model is proposed in which the number of setups, production quantity and over-time for each period are determined in the first step and the production-lot for each item is scheduled in the second step. As an approximation, the linear programming model is suggested and some sample problems are solved. This result means that the linear programming problems can be rapidly solved and their solution should provide a good approximation.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper studies the short-range production planning for a machine shop required to produce many different items so as to remain within capacity limitation. A new model is proposed in which the number of setups, production quantity and over-time for each period are determined in the first step and the production-lot for each item is scheduled in the second step. As an approximation, the linear programming model is suggested and some sample problems are solved. This result means that the linear programming problems can be rapidly solved and their solution should provide a good approximation.
Key concepts: Production planning, Time horizon, Production (economics), Linear programming, Mathematical optimization, Computer science, Range (aeronautics), Horizon