1986•TRANSACTIONS OF THE JAPAN SOCIETY OF MECHANICAL ENGINEERS Series COpen access

A planning model for lot production on short planning horizon.

Takayoshi Tamura

Open full text 1 citations

Abstract

This paper studies the short-range production planning for a machine shop required to produce many different items so as to remain within capacity limitation. A new model is proposed in which the number of setups, production quantity and over-time for each period are determined in the first step and the production-lot for each item is scheduled in the second step. As an approximation, the linear programming model is suggested and some sample problems are solved. This result means that the linear programming problems can be rapidly solved and their solution should provide a good approximation.

Open-access reader

About this research paper

What this paper is about

This paper studies the short-range production planning for a machine shop required to produce many different items so as to remain within capacity limitation. A new model is proposed in which the number of setups, production quantity and over-time for each period are determined in the first step and the production-lot for each item is scheduled in the second step. As an approximation, the linear programming model is suggested and some sample problems are solved. This result means that the linear programming problems can be rapidly solved and their solution should provide a good approximation.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper studies the short-range production planning for a machine shop required to produce many different items so as to remain within capacity limitation. A new model is proposed in which the number of setups, production quantity and over-time for each period are determined in the first step and the production-lot for each item is scheduled in the second step. As an approximation, the linear programming model is suggested and some sample problems are solved. This result means that the linear programming problems can be rapidly solved and their solution should provide a good approximation.

Key concepts: Production planning, Time horizon, Production (economics), Linear programming, Mathematical optimization, Computer science, Range (aeronautics), Horizon

Related papers

Back to paper searchBrowse research topicsOriginal source
A planning model for lot production on short planning horizon. — Research Paper | ScholarLens