PROCEDURE FOR DETERMINING DREDGING REQUIREMENTS IN COASTAL INLET CHANNELS

James W. Forman, Limberios Vallianos

Open full text 3 citations

Abstract

In order to assess the technical feasibility of a long term maintenance dredging plan at Oregon Inlet, a simple procedure was devised to evaluate the capabilities of existing ocean going hopper dredges to maintain an ocean entrance channel in an inlet environment characterized by wave climate and resulting influx of littoral material as severe as any Atlantic coast location. The dredging analysis procedure described in this paper was used to evaluate dredge plant capabilities under the operational constraints imposed by depth limitations resulting from the continuous influx of sediment into the project channel, the wave climate, and dredging production capacity in terms of actual hopper capacity and cycle times for different disposal schemes. The shoaling and dredging simulation procedure is described in terms of its application to the proposed navigation project at Oregon Inlet, NC.

Open-access reader

About this research paper

What this paper is about

In order to assess the technical feasibility of a long term maintenance dredging plan at Oregon Inlet, a simple procedure was devised to evaluate the capabilities of existing ocean going hopper dredges to maintain an ocean entrance channel in an inlet environment characterized by wave climate and resulting influx of littoral material as severe as any Atlantic coast location. The dredging analysis procedure described in this paper was used to evaluate dredge plant capabilities under the operational constraints imposed by depth limitations resulting from the continuous influx of sediment into the project channel, the wave climate, and dredging production capacity in terms of actual hopper capacity and cycle times for different disposal schemes. The shoaling and dredging simulation procedure is described in terms of its application to the proposed navigation project at Oregon Inlet, NC.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to assess the technical feasibility of a long term maintenance dredging plan at Oregon Inlet, a simple procedure was devised to evaluate the capabilities of existing ocean going hopper dredges to maintain an ocean entrance channel in an inlet environment characterized by wave climate and resulting influx of littoral material as severe as any Atlantic coast location. The dredging analysis procedure described in this paper was used to evaluate dredge plant capabilities under the operational constraints imposed by depth limitations resulting from the continuous influx of sediment into the project channel, the wave climate, and dredging production capacity in terms of actual hopper capacity and cycle times for different disposal schemes. The shoaling and dredging simulation procedure is described in terms of its application to the proposed navigation project at Oregon Inlet, NC.

Key concepts: Dredging, Inlet, Channel (broadcasting), Environmental science, Marine engineering, Mooring, Littoral zone, Hydrology (agriculture)