A parametric cost estimation model to develop prototype of electric vehicle based on activity-based costing
R. Ardiansyah, Wahyudi Sutopo, Muhammad Nizam
Abstract
R. Ardiansyah, Wahyudi Sutopo, Muhammad Nizam
Abstract
Accurate estimation is still challenging for the development stage of a product due to lack information about the production process, bill of material, and detailed activity. Parametric cost estimation based on activity-based costing can be used to generate the cost information of the whole process from the design stage until development stage. This paper presents a parametric cost estimation model that links activity-based costing to enhance accuracy of estimation for developing an electric vehicle prototype. The parametric cost represents the development process of a prototype consisting of four main processes. It also presents activities, cost center, and cost driver in each process. The total cost of each cost center is formulated by mathematical equations. A prototype of the Sebelas Maret Electric Vehicle is chosen as a case study. The proposed model can be utilized to predict total cost estimation the prototype of electric vehicle. This estimation method can influence cost reduction of developmental stage.
OpenAlex reports 14 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Accurate estimation is still challenging for the development stage of a product due to lack information about the production process, bill of material, and detailed activity. Parametric cost estimation based on activity-based costing can be used to generate the cost information of the whole process from the design stage until development stage. This paper presents a parametric cost estimation model that links activity-based costing to enhance accuracy of estimation for developing an electric vehicle prototype. The parametric cost represents the development process of a prototype consisting of four main processes. It also presents activities, cost center, and cost driver in each process. The total cost of each cost center is formulated by mathematical equations. A prototype of the Sebelas Maret Electric Vehicle is chosen as a case study. The proposed model can be utilized to predict total cost estimation the prototype of electric vehicle. This estimation method can influence cost reduction of developmental stage.
Key concepts: Activity-based costing, Cost estimate, Parametric statistics, Process (computing), Computer science, Cost reduction, Cost driver, Total cost