2011•Unpublished venueRequires access

The Performance Modelling of a Single and Dual Pressure Unfired Once Through Steam Generator

Emad Hamid, Mike A. Newby, Pericles Pilidis

Open publisher page 1 citations

Abstract

During the worldwide combined cycle power plant (CCPP) power plant building boom high pressure steam cycle has been the design of choice for the most power plant developers. In combined cycle power plant; there are many key areas that can be focused on for improving the thermal efficiency of the cycle and their performances. One of these areas is the unfired heat recovery steam generator so-called once through steam generator (OTSG). The unfired utility scale OTSG is a critical component in the combined cycle power plant, since it is the connection between the gas turbine (GT) and the steam turbine (ST) power units. In this paper, an adequate model has been developed for performance simulation of the once through steam generator OTSG in CCPP application. This model is well applicable for single and two-level of the steam cycle operation pressure. The developed model was tested against an existing OTSG installed at Manx Electricity Authority, and the obtained results and conclusions from this effort are satisfactory with a neglected error and will be a magnificent starting point for future improvements.

About this research paper

What this paper is about

During the worldwide combined cycle power plant (CCPP) power plant building boom high pressure steam cycle has been the design of choice for the most power plant developers. In combined cycle power plant; there are many key areas that can be focused on for improving the thermal efficiency of the cycle and their performances. One of these areas is the unfired heat recovery steam generator so-called once through steam generator (OTSG). The unfired utility scale OTSG is a critical component in the combined cycle power plant, since it is the connection between the gas turbine (GT) and the steam turbine (ST) power units. In this paper, an adequate model has been developed for performance simulation of the once through steam generator OTSG in CCPP application. This model is well applicable for single and two-level of the steam cycle operation pressure. The developed model was tested against an existing OTSG installed at Manx Electricity Authority, and the obtained results and conclusions from this effort are satisfactory with a neglected error and will be a magnificent starting point for future improvements.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

During the worldwide combined cycle power plant (CCPP) power plant building boom high pressure steam cycle has been the design of choice for the most power plant developers. In combined cycle power plant; there are many key areas that can be focused on for improving the thermal efficiency of the cycle and their performances. One of these areas is the unfired heat recovery steam generator so-called once through steam generator (OTSG). The unfired utility scale OTSG is a critical component in the combined cycle power plant, since it is the connection between the gas turbine (GT) and the steam turbine (ST) power units. In this paper, an adequate model has been developed for performance simulation of the once through steam generator OTSG in CCPP application. This model is well applicable for single and two-level of the steam cycle operation pressure. The developed model was tested against an existing OTSG installed at Manx Electricity Authority, and the obtained results and conclusions from this effort are satisfactory with a neglected error and will be a magnificent starting point for future improvements.

Key concepts: Combined cycle, Steam turbine, Heat recovery steam generator, Boiler (water heating), Steam-electric power station, Thermal power station, Power station, Rankine cycle

Related papers

Back to paper searchBrowse research topicsOriginal source
The Performance Modelling of a Single and Dual Pressure Unfired Once Through Steam Generator — Research Paper | ScholarLens