The rate of construction project accomplishment is weak because of the rapid increasing rate of major defects in building as a result of poor quality materials and workmanship which has been identified as the major cause of defects in Nigerian construction projects.This necessitated the examination of problem of poor workmanship as a major cause of building defects.This was achieved by examining the factors leading to poor workmanship quality in public building projects.Data were sourced on public building projects whose contracts have been executed from practitioners in the construction industry in Minna, Nigeria through the use of questionnaires.The analysis of data was carried out using mean item score and correlation analysis.Eight factors were identified as factors which contribute to poor quality workmanship out of which limited cost or poor funding of public building projects was the major factor that causes poor workmanship quality, while proper construction management and strict supervision were found to be the most effective solutions for solving the problem of poor quality workmanship.Recommendations from the study included that proper construction management and strict supervision are required during project execution.

Open-access reader

About this research paper

What this paper is about

The rate of construction project accomplishment is weak because of the rapid increasing rate of major defects in building as a result of poor quality materials and workmanship which has been identified as the major cause of defects in Nigerian construction projects.This necessitated the examination of problem of poor workmanship as a major cause of building defects.This was achieved by examining the factors leading to poor workmanship quality in public building projects.Data were sourced on public building projects whose contracts have been executed from practitioners in the construction industry in Minna, Nigeria through the use of questionnaires.The analysis of data was carried out using mean item score and correlation analysis.Eight factors were identified as factors which contribute to poor quality workmanship out of which limited cost or poor funding of public building projects was the major factor that causes poor workmanship quality, while proper construction management and strict supervision were found to be the most effective solutions for solving the problem of poor quality workmanship.Recommendations from the study included that proper construction management and strict supervision are required during project execution.

Why it matters

OpenAlex reports 18 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The rate of construction project accomplishment is weak because of the rapid increasing rate of major defects in building as a result of poor quality materials and workmanship which has been identified as the major cause of defects in Nigerian construction projects.This necessitated the examination of problem of poor workmanship as a major cause of building defects.This was achieved by examining the factors leading to poor workmanship quality in public building projects.Data were sourced on public building projects whose contracts have been executed from practitioners in the construction industry in Minna, Nigeria through the use of questionnaires.The analysis of data was carried out using mean item score and correlation analysis.Eight factors were identified as factors which contribute to poor quality workmanship out of which limited cost or poor funding of public building projects was the major factor that causes poor workmanship quality, while proper construction management and strict supervision were found to be the most effective solutions for solving the problem of poor quality workmanship.Recommendations from the study included that proper construction management and strict supervision are required during project execution.

Key concepts: Workmanship, Architectural engineering, Business, Operations management, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Appraisal of Building Defects Due To Poor Workmanship In Public Building Projects In Minna, Nigeria — Research Paper | ScholarLens