2015Abu Dhabi International Petroleum Exhibition and ConferenceRequires access

Produced Water Re-injection (PWRI) - Case Study from On-shore Abu Dhabi

K.A. Mahmoud, A. Al Tenaiji, Mohsen Al Sharafi, Samer Elabd, Medhat Abdou, Hisham Hafez

Open publisher page 8 citations

Abstract

Abstract Water production normally increases as field gets more matured; especially for fields developed via water injection or natural aquifer support. Handling water production is always a challenge from both financial and environmental prospects. The field under study is a giant oil and gas producer in Gulf area. Before embarking on the PWRI project, the routine way to handle the field's water production (~65 Mbbls/d) was to dispose through dedicated wells drilled only for that purpose and completed as open hole in Dammam, Simsima and UER formations. On the other hand, the water injection project sourced by water supply wells drilled and completed with ESP's through the same formations. In 2010, PWRI project was commenced through replacing the aquifer water injection by produced water re-injection in one of the water injection clusters without water treatment. Since then, about 22–29 Mbbls/d of produced water are being injected through four water injection wells. After commencing the project, it was very crucial to assure that, no injectivity impairment due to produced water re-injection in addition to wells' integrity. The water injection performance was closely monitored as WHIP and injection rate and using some techniques like Hall plot to detect any injectivity impact. Pressure fall-off tests (PFO) were frequently performed to detect any formation damage associated with PWRI. Moreover, PLT was performed in one of the wells before and after switching from aquifer water to injection water. The two logs were compared and proved that, there is no change in the injection profile across the horizontal section of that well. Corrosion logs were also utilized showing that, no integrity issues related to PWRI. As of now, some 24 MMbbls of produced water were injected with no impact on wells' injectivity or integrity.

About this research paper

What this paper is about

Abstract Water production normally increases as field gets more matured; especially for fields developed via water injection or natural aquifer support. Handling water production is always a challenge from both financial and environmental prospects. The field under study is a giant oil and gas producer in Gulf area. Before embarking on the PWRI project, the routine way to handle the field's water production (~65 Mbbls/d) was to dispose through dedicated wells drilled only for that purpose and completed as open hole in Dammam, Simsima and UER formations. On the other hand, the water injection project sourced by water supply wells drilled and completed with ESP's through the same formations. In 2010, PWRI project was commenced through replacing the aquifer water injection by produced water re-injection in one of the water injection clusters without water treatment. Since then, about 22–29 Mbbls/d of produced water are being injected through four water injection wells. After commencing the project, it was very crucial to assure that, no injectivity impairment due to produced water re-injection in addition to wells' integrity. The water injection performance was closely monitored as WHIP and injection rate and using some techniques like Hall plot to detect any injectivity impact. Pressure fall-off tests (PFO) were frequently performed to detect any formation damage associated with PWRI. Moreover, PLT was performed in one of the wells before and after switching from aquifer water to injection water. The two logs were compared and proved that, there is no change in the injection profile across the horizontal section of that well. Corrosion logs were also utilized showing that, no integrity issues related to PWRI. As of now, some 24 MMbbls of produced water were injected with no impact on wells' injectivity or integrity.

Why it matters

OpenAlex reports 8 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract Water production normally increases as field gets more matured; especially for fields developed via water injection or natural aquifer support. Handling water production is always a challenge from both financial and environmental prospects. The field under study is a giant oil and gas producer in Gulf area. Before embarking on the PWRI project, the routine way to handle the field's water production (~65 Mbbls/d) was to dispose through dedicated wells drilled only for that purpose and completed as open hole in Dammam, Simsima and UER formations. On the other hand, the water injection project sourced by water supply wells drilled and completed with ESP's through the same formations. In 2010, PWRI project was commenced through replacing the aquifer water injection by produced water re-injection in one of the water injection clusters without water treatment. Since then, about 22–29 Mbbls/d of produced water are being injected through four water injection wells. After commencing the project, it was very crucial to assure that, no injectivity impairment due to produced water re-injection in addition to wells' integrity. The water injection performance was closely monitored as WHIP and injection rate and using some techniques like Hall plot to detect any injectivity impact. Pressure fall-off tests (PFO) were frequently performed to detect any formation damage associated with PWRI. Moreover, PLT was performed in one of the wells before and after switching from aquifer water to injection water. The two logs were compared and proved that, there is no change in the injection profile across the horizontal section of that well. Corrosion logs were also utilized showing that, no integrity issues related to PWRI. As of now, some 24 MMbbls of produced water were injected with no impact on wells' injectivity or integrity.

Key concepts: Water injection (oil production), Injection well, Abu dhabi, Aquifer, Petroleum engineering, Produced water, Water well, Environmental science