Design and Construction of Hwamyung Bridge

Kwang-Soo Kim, Eun-Chul Lee, Chun-Soo Lee, Eu-Kyeong Cho

Open publisher page 1 citations

Abstract

Hwamyung Bridge over the Nakdong River is the largest cast-in place concrete cable stayed bridge in Korea with a center span of 270m and side span of 115m each. The stay-cables are spaced at 6.8m along the box girder and arranged in a semi-harp configuration. They are anchored at central single towers with vertical leg extending 65m above the deck. With the closure of center span in November 2010, the erection of cable and box girder, which is a major portion of the bridge construction, was completed.

About this research paper

What this paper is about

Hwamyung Bridge over the Nakdong River is the largest cast-in place concrete cable stayed bridge in Korea with a center span of 270m and side span of 115m each. The stay-cables are spaced at 6.8m along the box girder and arranged in a semi-harp configuration. They are anchored at central single towers with vertical leg extending 65m above the deck. With the closure of center span in November 2010, the erection of cable and box girder, which is a major portion of the bridge construction, was completed.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Hwamyung Bridge over the Nakdong River is the largest cast-in place concrete cable stayed bridge in Korea with a center span of 270m and side span of 115m each. The stay-cables are spaced at 6.8m along the box girder and arranged in a semi-harp configuration. They are anchored at central single towers with vertical leg extending 65m above the deck. With the closure of center span in November 2010, the erection of cable and box girder, which is a major portion of the bridge construction, was completed.

Key concepts: Bridge (graph theory), Span (engineering), Deck, Structural engineering, Closure (psychology), Box girder, Center (category theory), Girder

Related papers

Back to paper searchBrowse research topicsOriginal source
Design and Construction of Hwamyung Bridge — Research Paper | ScholarLens