2001•DR-NTU (Nanyang Technological University)Requires access

A study of semiconductor back-end manufacturing : special focus on scheduling techniques.

Choon Keong Ong, Chee‐Chong Teo, Lip Pin Yeo

Open publisher page 0 citations

Abstract

The purpose of this project was to study the impact of release input, lot dispatch and lot batching policies on the mean and variance of cycle time in the semiconductor back-end facility.

About this research paper

What this paper is about

The purpose of this project was to study the impact of release input, lot dispatch and lot batching policies on the mean and variance of cycle time in the semiconductor back-end facility.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The purpose of this project was to study the impact of release input, lot dispatch and lot batching policies on the mean and variance of cycle time in the semiconductor back-end facility.

Key concepts: Scheduling (production processes), Manufacturing engineering, Semiconductor device fabrication, Engineering, Computer science, Industrial engineering, Operations management, Electrical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
A study of semiconductor back-end manufacturing : special focus on scheduling techniques. — Research Paper | ScholarLens