Direct sorbent injection for combined SO/sub 2//NO/sub x/ removal. Quarterly technical progress report, January-March 1986
T.E. Dowdy, Jim Henry, J.J. Lee, S.I. Byrd, Thomas V. Giel, W.P. Millard
Abstract
T.E. Dowdy, Jim Henry, J.J. Lee, S.I. Byrd, Thomas V. Giel, W.P. Millard
Abstract
During the April through June 1986 quarter checkout of the Direct Sorbent Injection Facility (DSIF) was completed. Initial gas and droplet velocity mapping was conducted with the laser velocimeter equipment, and progress was made in the analytical modeling of the process. Additionally, a test plan was prepared for the drying rate and SO/sub 2/ removal tests (Series D and S testing). Included in the preparation of the test plan was the completion of all calculations required for determining testing conditions and the determination of the experimental test matrix.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
During the April through June 1986 quarter checkout of the Direct Sorbent Injection Facility (DSIF) was completed. Initial gas and droplet velocity mapping was conducted with the laser velocimeter equipment, and progress was made in the analytical modeling of the process. Additionally, a test plan was prepared for the drying rate and SO/sub 2/ removal tests (Series D and S testing). Included in the preparation of the test plan was the completion of all calculations required for determining testing conditions and the determination of the experimental test matrix.
Key concepts: Sorbent, Plan (archaeology), Environmental science, Materials science, Analytical Chemistry (journal), Chromatography, Chemistry, Geology