2008Unpublished venueRequires access

Environmental assessment summary report for Wuxi Hiushan third phase wastewater treatment works

Nanjing

Open publisher page 0 citations

Abstract

This is the environmental assessment for the Tai Basin Urban Environment Project. It describes mitigation measures to reduce expected negative environmental impacts, discussed as follows. During the design phase, water discharge structures for the wastewater treatment plants will be designed to control the discharge of safe water flows, and, the collection and treatment of odorous gases shall be considered. During construction, water should be sprayed on working sites, transport routes, and on material stockpiles. To reduce noise disturbances, a work activity timetable will be worked out. Water and land traffic plans will be coordinated with central urban traffic authorities. Temporary treatment facilities such as water collecting tanks, sedimentation tanks, oil separating tanks, and water drainage ditches will be built to treat wastewater produced during works. To prevent contamination from septic tanks, and in groundwater, wastewater treatment facilities will be built. Construction debris and contaminated soil will be disposed of appropriately, at selected landfills, strictly forbidding waste disposal on rivers, lakes, or sea. During the operational period, temporary emergency measures will be in use to avoid direct discharge of wastewater in the event of power supply failures, overflows, equipment failures, or other adverse conditions. Other measures include: treatment of domestic wastewater prior to discharges, with simple sedimentation tanks; and, location of work sites should be at an agreed distance, away from residential sites. Sites and roads should be sprayed frequently, while replanting of trees and vegetative propagation should follow construction.

About this research paper

What this paper is about

This is the environmental assessment for the Tai Basin Urban Environment Project. It describes mitigation measures to reduce expected negative environmental impacts, discussed as follows. During the design phase, water discharge structures for the wastewater treatment plants will be designed to control the discharge of safe water flows, and, the collection and treatment of odorous gases shall be considered. During construction, water should be sprayed on working sites, transport routes, and on material stockpiles. To reduce noise disturbances, a work activity timetable will be worked out. Water and land traffic plans will be coordinated with central urban traffic authorities. Temporary treatment facilities such as water collecting tanks, sedimentation tanks, oil separating tanks, and water drainage ditches will be built to treat wastewater produced during works. To prevent contamination from septic tanks, and in groundwater, wastewater treatment facilities will be built. Construction debris and contaminated soil will be disposed of appropriately, at selected landfills, strictly forbidding waste disposal on rivers, lakes, or sea. During the operational period, temporary emergency measures will be in use to avoid direct discharge of wastewater in the event of power supply failures, overflows, equipment failures, or other adverse conditions. Other measures include: treatment of domestic wastewater prior to discharges, with simple sedimentation tanks; and, location of work sites should be at an agreed distance, away from residential sites. Sites and roads should be sprayed frequently, while replanting of trees and vegetative propagation should follow construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This is the environmental assessment for the Tai Basin Urban Environment Project. It describes mitigation measures to reduce expected negative environmental impacts, discussed as follows. During the design phase, water discharge structures for the wastewater treatment plants will be designed to control the discharge of safe water flows, and, the collection and treatment of odorous gases shall be considered. During construction, water should be sprayed on working sites, transport routes, and on material stockpiles. To reduce noise disturbances, a work activity timetable will be worked out. Water and land traffic plans will be coordinated with central urban traffic authorities. Temporary treatment facilities such as water collecting tanks, sedimentation tanks, oil separating tanks, and water drainage ditches will be built to treat wastewater produced during works. To prevent contamination from septic tanks, and in groundwater, wastewater treatment facilities will be built. Construction debris and contaminated soil will be disposed of appropriately, at selected landfills, strictly forbidding waste disposal on rivers, lakes, or sea. During the operational period, temporary emergency measures will be in use to avoid direct discharge of wastewater in the event of power supply failures, overflows, equipment failures, or other adverse conditions. Other measures include: treatment of domestic wastewater prior to discharges, with simple sedimentation tanks; and, location of work sites should be at an agreed distance, away from residential sites. Sites and roads should be sprayed frequently, while replanting of trees and vegetative propagation should follow construction.

Key concepts: Environmental science, Wastewater, Sewage treatment, Sedimentation, Waste management, Drainage, Water supply, Waste disposal

Related papers

Back to paper searchBrowse research topicsOriginal source
Environmental assessment summary report for Wuxi Hiushan third phase wastewater treatment works — Research Paper | ScholarLens