Seikan Undersea Tunnel

Boyd C. Paulson

Open publisher page 2 citations

Abstract

The 5.5m diameter Seikan Tunnel in Japan will extend 54 kilometers, crossing under the Tsugaru Straits. When completed the −2 billion tunnel will be the longest in the world, and will carry both standard-gauge rail traffic as well as the 260 km/hr Shinkansen passenger express trains. To construct this tunnel, however, it has been necessary to go through extremely difficult geologic conditions, including about a dozen major faults, volcanic strata, and areas with water bearing formations transmitting up to the full 250-meter hydrostatic head from the sea above. The main construction procedures are outlined, including excavation of a pilot bore and service bore as well as the main tunnel. Long horizontal exploratory drilling has been employed, and excavation itself is preceded by extensive chemical grouting.

About this research paper

What this paper is about

The 5.5m diameter Seikan Tunnel in Japan will extend 54 kilometers, crossing under the Tsugaru Straits. When completed the −2 billion tunnel will be the longest in the world, and will carry both standard-gauge rail traffic as well as the 260 km/hr Shinkansen passenger express trains. To construct this tunnel, however, it has been necessary to go through extremely difficult geologic conditions, including about a dozen major faults, volcanic strata, and areas with water bearing formations transmitting up to the full 250-meter hydrostatic head from the sea above. The main construction procedures are outlined, including excavation of a pilot bore and service bore as well as the main tunnel. Long horizontal exploratory drilling has been employed, and excavation itself is preceded by extensive chemical grouting.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The 5.5m diameter Seikan Tunnel in Japan will extend 54 kilometers, crossing under the Tsugaru Straits. When completed the −2 billion tunnel will be the longest in the world, and will carry both standard-gauge rail traffic as well as the 260 km/hr Shinkansen passenger express trains. To construct this tunnel, however, it has been necessary to go through extremely difficult geologic conditions, including about a dozen major faults, volcanic strata, and areas with water bearing formations transmitting up to the full 250-meter hydrostatic head from the sea above. The main construction procedures are outlined, including excavation of a pilot bore and service bore as well as the main tunnel. Long horizontal exploratory drilling has been employed, and excavation itself is preceded by extensive chemical grouting.

Key concepts: Excavation, Drilling, Train, Geology, Directional drilling, Engineering, Railway tunnel, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Seikan Undersea Tunnel — Research Paper | ScholarLens