1979•US Army Corps of Engineers: Engineer Research and Development Center (Knowledge Core)Open access

Navigation Conditions at Locks and Dam 26, Mississippi River; Hydraulic Model Investigation.

Louis J. Shows, John J. Franco

Open full text 0 citations

Abstract

A fixed-bed model reproduced about 6.7 miles of the Mississippi River Channel, Ellis and Maple Islands, and the adjacent overbank areas to an undistorted scale of 1:120.The model study was concerned with the composition and configuration of the dam, arrangement and separation of the locks and lock walls, and navigation conditions in the lock approaches.The investigation has produced the following general results and conclusions: (a) Satisfactory navigation conditions for two-way traffic could be developed at either the existing site or the proposed replacement site by providing gates between the locks.The number of gates in the proposed gated spillway could be reduced to seven without producing any significant changes affecting the movement of a tow approaching the locks.(b) Currents in the upper approach to the l~ndward lock at the alternate site would be affected by the eddy forming along the left overbank.Placing a fill along the overbank to an elevation above normal pool would reduce the effect of the eddy on navigation.(c) Ports will be required in the upper guard walls to reduce the intensity of the crosscurrent near the end of the walls.The riverward lock guard wall should extend farther upstream than the landward guard wall.(d) In the lower lock approaches, navigation conditions for two-way traffic could be improved with guard walls shorter than 1200 ft .(e) With the locks separated, navigation conditions could be developed in both the upstream and downstream approaches with the locks used simultaneously without the operation of one interfering with the operation of the other .(f) During construction of the project, adequate navigation conditions could be maintained by using a three-stage cofferdam with the first stage located on the Missouri side and the third stage along the Illinois side.(g) Scouring of the bed can be expected along the upper corners of the cofferdams on the river side, particularly during long periods of extreme flow conditions.Along the main cofferdam, scouring can be eliminated or minimized with a deflector installed at the upstream corner on the river side of each cofferdam.

Open-access reader

About this research paper

What this paper is about

A fixed-bed model reproduced about 6.7 miles of the Mississippi River Channel, Ellis and Maple Islands, and the adjacent overbank areas to an undistorted scale of 1:120.The model study was concerned with the composition and configuration of the dam, arrangement and separation of the locks and lock walls, and navigation conditions in the lock approaches.The investigation has produced the following general results and conclusions: (a) Satisfactory navigation conditions for two-way traffic could be developed at either the existing site or the proposed replacement site by providing gates between the locks.The number of gates in the proposed gated spillway could be reduced to seven without producing any significant changes affecting the movement of a tow approaching the locks.(b) Currents in the upper approach to the l~ndward lock at the alternate site would be affected by the eddy forming along the left overbank.Placing a fill along the overbank to an elevation above normal pool would reduce the effect of the eddy on navigation.(c) Ports will be required in the upper guard walls to reduce the intensity of the crosscurrent near the end of the walls.The riverward lock guard wall should extend farther upstream than the landward guard wall.(d) In the lower lock approaches, navigation conditions for two-way traffic could be improved with guard walls shorter than 1200 ft .(e) With the locks separated, navigation conditions could be developed in both the upstream and downstream approaches with the locks used simultaneously without the operation of one interfering with the operation of the other .(f) During construction of the project, adequate navigation conditions could be maintained by using a three-stage cofferdam with the first stage located on the Missouri side and the third stage along the Illinois side.(g) Scouring of the bed can be expected along the upper corners of the cofferdams on the river side, particularly during long periods of extreme flow conditions.Along the main cofferdam, scouring can be eliminated or minimized with a deflector installed at the upstream corner on the river side of each cofferdam.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A fixed-bed model reproduced about 6.7 miles of the Mississippi River Channel, Ellis and Maple Islands, and the adjacent overbank areas to an undistorted scale of 1:120.The model study was concerned with the composition and configuration of the dam, arrangement and separation of the locks and lock walls, and navigation conditions in the lock approaches.The investigation has produced the following general results and conclusions: (a) Satisfactory navigation conditions for two-way traffic could be developed at either the existing site or the proposed replacement site by providing gates between the locks.The number of gates in the proposed gated spillway could be reduced to seven without producing any significant changes affecting the movement of a tow approaching the locks.(b) Currents in the upper approach to the l~ndward lock at the alternate site would be affected by the eddy forming along the left overbank.Placing a fill along the overbank to an elevation above normal pool would reduce the effect of the eddy on navigation.(c) Ports will be required in the upper guard walls to reduce the intensity of the crosscurrent near the end of the walls.The riverward lock guard wall should extend farther upstream than the landward guard wall.(d) In the lower lock approaches, navigation conditions for two-way traffic could be improved with guard walls shorter than 1200 ft .(e) With the locks separated, navigation conditions could be developed in both the upstream and downstream approaches with the locks used simultaneously without the operation of one interfering with the operation of the other .(f) During construction of the project, adequate navigation conditions could be maintained by using a three-stage cofferdam with the first stage located on the Missouri side and the third stage along the Illinois side.(g) Scouring of the bed can be expected along the upper corners of the cofferdams on the river side, particularly during long periods of extreme flow conditions.Along the main cofferdam, scouring can be eliminated or minimized with a deflector installed at the upstream corner on the river side of each cofferdam.

Key concepts: Spillway, Lock (firearm), Overbank, Channel (broadcasting), Hydrology (agriculture), Section (typography), River bed, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Navigation Conditions at Locks and Dam 26, Mississippi River; Hydraulic Model Investigation. — Research Paper | ScholarLens