Abandoned coal mine stores gas for Colorado peak-day demands

Lance Brown

Open publisher page 4 citations

Abstract

Since 1961, the Leyden Mine, from which 6 million tons of coal had been removed to leave a 150 million cu ft void, has been used for gas storage at 250 psig max pressure, after the hoisting and ventilation shafts had been sealed with concrete, rock, sand, and mud. Following several withdrawal expansions, a design for maximum delivery of 230 million cu ft/day for five days with a pressure drop in the cavern down to 100 psig was developed to satisfy customer requirements for peak shaving. This required redesigning the gathering system by looping large existing lines, eliminating inefficient ones, and drilling additional wells; installing three lightweight 3500-hp Centaur turbine/compressor units from Solar Turbines International to provide the minimum 200 psig compressor discharge pressure needed for gas distribution on peak usage days; and installing Donaldson Co. engine air-inlet silencers on the turbine inlets to reduce noise levels below the public code requirement. In the 1977-78 heating season, the Leyden facility produced 196 million cu ft/day of gas; with continued load growth and well drilling to reduce pressure loss, the maximum design flow rate will be attained.

About this research paper

What this paper is about

Since 1961, the Leyden Mine, from which 6 million tons of coal had been removed to leave a 150 million cu ft void, has been used for gas storage at 250 psig max pressure, after the hoisting and ventilation shafts had been sealed with concrete, rock, sand, and mud. Following several withdrawal expansions, a design for maximum delivery of 230 million cu ft/day for five days with a pressure drop in the cavern down to 100 psig was developed to satisfy customer requirements for peak shaving. This required redesigning the gathering system by looping large existing lines, eliminating inefficient ones, and drilling additional wells; installing three lightweight 3500-hp Centaur turbine/compressor units from Solar Turbines International to provide the minimum 200 psig compressor discharge pressure needed for gas distribution on peak usage days; and installing Donaldson Co. engine air-inlet silencers on the turbine inlets to reduce noise levels below the public code requirement. In the 1977-78 heating season, the Leyden facility produced 196 million cu ft/day of gas; with continued load growth and well drilling to reduce pressure loss, the maximum design flow rate will be attained.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Since 1961, the Leyden Mine, from which 6 million tons of coal had been removed to leave a 150 million cu ft void, has been used for gas storage at 250 psig max pressure, after the hoisting and ventilation shafts had been sealed with concrete, rock, sand, and mud. Following several withdrawal expansions, a design for maximum delivery of 230 million cu ft/day for five days with a pressure drop in the cavern down to 100 psig was developed to satisfy customer requirements for peak shaving. This required redesigning the gathering system by looping large existing lines, eliminating inefficient ones, and drilling additional wells; installing three lightweight 3500-hp Centaur turbine/compressor units from Solar Turbines International to provide the minimum 200 psig compressor discharge pressure needed for gas distribution on peak usage days; and installing Donaldson Co. engine air-inlet silencers on the turbine inlets to reduce noise levels below the public code requirement. In the 1977-78 heating season, the Leyden facility produced 196 million cu ft/day of gas; with continued load growth and well drilling to reduce pressure loss, the maximum design flow rate will be attained.

Key concepts: Gas compressor, Pressure drop, Inlet, Environmental science, Drilling, Coal, Petroleum engineering, Waste management

Related papers

Back to paper searchBrowse research topicsOriginal source
Abandoned coal mine stores gas for Colorado peak-day demands — Research Paper | ScholarLens