1998Unpublished venueRequires access

CZECH RAILWAYS EXPERIENCE WITH UPGRADING OF MIXED TRAFFIC CORRIDORS TO 100 MPH OPERATION

D Marusicova

Open publisher page 0 citations

Abstract

This presentation, offered at a conference on railroad track and structures, provides an overview of efforts by the Czech national railroad to upgrade its mixed traffic corridors to infrastructure capable of handling 100 mile per hour operation. This speed upgrade required improvements in: track components and technology, track design parameters, diagnostic practices, vehicles, and track/vehicle interaction technology.

About this research paper

What this paper is about

This presentation, offered at a conference on railroad track and structures, provides an overview of efforts by the Czech national railroad to upgrade its mixed traffic corridors to infrastructure capable of handling 100 mile per hour operation. This speed upgrade required improvements in: track components and technology, track design parameters, diagnostic practices, vehicles, and track/vehicle interaction technology.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This presentation, offered at a conference on railroad track and structures, provides an overview of efforts by the Czech national railroad to upgrade its mixed traffic corridors to infrastructure capable of handling 100 mile per hour operation. This speed upgrade required improvements in: track components and technology, track design parameters, diagnostic practices, vehicles, and track/vehicle interaction technology.

Key concepts: Upgrade, Track (disk drive), Czech, Mile, Transport engineering, Presentation (obstetrics), Fast track, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
CZECH RAILWAYS EXPERIENCE WITH UPGRADING OF MIXED TRAFFIC CORRIDORS TO 100 MPH OPERATION — Research Paper | ScholarLens