Environmental factors in the siting of wind turbines
Ernst Kristoffersen
Abstract
Ernst Kristoffersen
Abstract
SYNOPSIS This paper examines Danish considerations and experience. Localization—the indication of the exact location—has a decisive influence on the profitability of a wind turbine project. By means of the Wind Atlas the annual energy production from a given turbine at a given site can be estimated. In siting, a number of conflicting interests must be weighed against each other. For the large-scale production of electricity, wind farms are required. In Denmark a national localization survey for wind farms producing 4 TWh/year was carried out. The study delimitates 28 areas within which the first 250 wind turbines, each rated at 2.5 MW, can produce 2 TWh/year. The possibility of offshore siting has been investigated as well as the attitudes of the local politicians and the citizens towards a wind farm. The marketing of larger and cheaper wind turbines makes the inclusion of wind energy in physical planning difficult.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
SYNOPSIS This paper examines Danish considerations and experience. Localization—the indication of the exact location—has a decisive influence on the profitability of a wind turbine project. By means of the Wind Atlas the annual energy production from a given turbine at a given site can be estimated. In siting, a number of conflicting interests must be weighed against each other. For the large-scale production of electricity, wind farms are required. In Denmark a national localization survey for wind farms producing 4 TWh/year was carried out. The study delimitates 28 areas within which the first 250 wind turbines, each rated at 2.5 MW, can produce 2 TWh/year. The possibility of offshore siting has been investigated as well as the attitudes of the local politicians and the citizens towards a wind farm. The marketing of larger and cheaper wind turbines makes the inclusion of wind energy in physical planning difficult.
Key concepts: Offshore wind power, Wind power, Turbine, Electricity, Production (economics), Profitability index, Renewable energy, Sea breeze