Lighting commissioning -- A neglected opportunity
Evan Mills
Abstract
Evan Mills
Abstract
When people have the courage to measure energy savings, they often find that the actual performance does not match the design calculations. This can occur if systems are not installed or operated as assumed by the designer and engineer who made the pre-construction energy use estimates. This performance gap can be dramatic. Energy-efficient lighting improvements are particularly vulnerable to this problem. Actual and predicted lighting energy savings can differ significantly. One solution is commissioning--to check that the systems are installed and operated as intended.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
When people have the courage to measure energy savings, they often find that the actual performance does not match the design calculations. This can occur if systems are not installed or operated as assumed by the designer and engineer who made the pre-construction energy use estimates. This performance gap can be dramatic. Energy-efficient lighting improvements are particularly vulnerable to this problem. Actual and predicted lighting energy savings can differ significantly. One solution is commissioning--to check that the systems are installed and operated as intended.
Key concepts: Project commissioning, Courage, Energy (signal processing), Measure (data warehouse), Architectural engineering, Engineering, Energy performance, Efficient energy use