Prevailing practice to derive length of the jumper on tension towers is based on trial and error method, which consumes more time in construction activity. In this paper, we have described details of the program developed by us. It calculates the length of each jumper of every tension tower prior installation of jumper. Jumper can be assembled at store and carried to site to install, this can save time spent on trial and error method. Jumper Length for each loop is calculated based on actual tower dimensions, actual survey data and insulator string dimensions. Jumper can be cut and compressed at the site store in much controlled condition and install at site without any trial and error.

About this research paper

What this paper is about

Prevailing practice to derive length of the jumper on tension towers is based on trial and error method, which consumes more time in construction activity. In this paper, we have described details of the program developed by us. It calculates the length of each jumper of every tension tower prior installation of jumper. Jumper can be assembled at store and carried to site to install, this can save time spent on trial and error method. Jumper Length for each loop is calculated based on actual tower dimensions, actual survey data and insulator string dimensions. Jumper can be cut and compressed at the site store in much controlled condition and install at site without any trial and error.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Prevailing practice to derive length of the jumper on tension towers is based on trial and error method, which consumes more time in construction activity. In this paper, we have described details of the program developed by us. It calculates the length of each jumper of every tension tower prior installation of jumper. Jumper can be assembled at store and carried to site to install, this can save time spent on trial and error method. Jumper Length for each loop is calculated based on actual tower dimensions, actual survey data and insulator string dimensions. Jumper can be cut and compressed at the site store in much controlled condition and install at site without any trial and error.

Key concepts: Jumper, Tower, String (physics), Engineering, Simulation, Computer science, Structural engineering, Mathematics

Back to paper searchBrowse research topicsOriginal source
Pre-assembled jumper installation of calculated length for transmission tower — Research Paper | ScholarLens