Supplemental Environmental Assessment Anti-Terrorism/Force Protection Upgrades at Beale Air Force Base, California

Dawn Coultrap, Darren Rector, Rebecca Lopez, Michael E. Ernst

Open publisher page 0 citations

Abstract

Abstract : NAME OF THE PROPOSED ACTION: Anti-Terrorism/Force Protection Upgrades at Beale Air Force Base (AFB), California DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES: Proposed Action. The Proposed Action consists of four construction projects, which include reconfiguring the Anti-Terrorism/Force Protection (AT/FP) infrastructure at the Main and Wheatland Gates, installing new perimeter fencing, and constructing a gravel pad and perimeter fence at the Air Force Combat Ammunition Center (AFCOMAC). No changes in personnel requirements or aircraft operations would occur. No Action Alternative. Under the No Action Alternative, Beale Air Force Base (AFB) would continue to use the two entry control points (ECP) and existing perimeter fencing in their current condition and configuration. In addition, the AFCOMAC would continue their mission requirements with their current pad and fence configuration. There would be no change from the existing conditions at the installation. This alternative would not address the security and safety requirements of the Air Combat Command (ACC) and Beale AFB or the traffic congestion problems, or meet the standards specified in UFC 4-010-01. SUMMARY OF ENVIRONMENTAL CONSEQUENCES. The scoping process focused the analysis on the following environmental resources: Biological Resources, Water Resources, Geological Resources, Cultural Resources, Air Quality, Hazardous Materials, Transportation, and Safety. Details of the environmental consequences can be found in the Enviwnmental Assessment which is hereby incorporated by reference. The original Draft AT/FP Environmental Assessment (EA) was made available for a 30- day public comment period in September 2004. A Notice of Availability was published in the local newspaper, the Marysville Appeal-Democrat and the Beale AFB public affairs website. The EA was revised as a result of a state agency request for additional information and has been released for a 30-day public comment period again.

About this research paper

What this paper is about

Abstract : NAME OF THE PROPOSED ACTION: Anti-Terrorism/Force Protection Upgrades at Beale Air Force Base (AFB), California DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES: Proposed Action. The Proposed Action consists of four construction projects, which include reconfiguring the Anti-Terrorism/Force Protection (AT/FP) infrastructure at the Main and Wheatland Gates, installing new perimeter fencing, and constructing a gravel pad and perimeter fence at the Air Force Combat Ammunition Center (AFCOMAC). No changes in personnel requirements or aircraft operations would occur. No Action Alternative. Under the No Action Alternative, Beale Air Force Base (AFB) would continue to use the two entry control points (ECP) and existing perimeter fencing in their current condition and configuration. In addition, the AFCOMAC would continue their mission requirements with their current pad and fence configuration. There would be no change from the existing conditions at the installation. This alternative would not address the security and safety requirements of the Air Combat Command (ACC) and Beale AFB or the traffic congestion problems, or meet the standards specified in UFC 4-010-01. SUMMARY OF ENVIRONMENTAL CONSEQUENCES. The scoping process focused the analysis on the following environmental resources: Biological Resources, Water Resources, Geological Resources, Cultural Resources, Air Quality, Hazardous Materials, Transportation, and Safety. Details of the environmental consequences can be found in the Enviwnmental Assessment which is hereby incorporated by reference. The original Draft AT/FP Environmental Assessment (EA) was made available for a 30- day public comment period in September 2004. A Notice of Availability was published in the local newspaper, the Marysville Appeal-Democrat and the Beale AFB public affairs website. The EA was revised as a result of a state agency request for additional information and has been released for a 30-day public comment period again.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract : NAME OF THE PROPOSED ACTION: Anti-Terrorism/Force Protection Upgrades at Beale Air Force Base (AFB), California DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES: Proposed Action. The Proposed Action consists of four construction projects, which include reconfiguring the Anti-Terrorism/Force Protection (AT/FP) infrastructure at the Main and Wheatland Gates, installing new perimeter fencing, and constructing a gravel pad and perimeter fence at the Air Force Combat Ammunition Center (AFCOMAC). No changes in personnel requirements or aircraft operations would occur. No Action Alternative. Under the No Action Alternative, Beale Air Force Base (AFB) would continue to use the two entry control points (ECP) and existing perimeter fencing in their current condition and configuration. In addition, the AFCOMAC would continue their mission requirements with their current pad and fence configuration. There would be no change from the existing conditions at the installation. This alternative would not address the security and safety requirements of the Air Combat Command (ACC) and Beale AFB or the traffic congestion problems, or meet the standards specified in UFC 4-010-01. SUMMARY OF ENVIRONMENTAL CONSEQUENCES. The scoping process focused the analysis on the following environmental resources: Biological Resources, Water Resources, Geological Resources, Cultural Resources, Air Quality, Hazardous Materials, Transportation, and Safety. Details of the environmental consequences can be found in the Enviwnmental Assessment which is hereby incorporated by reference. The original Draft AT/FP Environmental Assessment (EA) was made available for a 30- day public comment period in September 2004. A Notice of Availability was published in the local newspaper, the Marysville Appeal-Democrat and the Beale AFB public affairs website. The EA was revised as a result of a state agency request for additional information and has been released for a 30-day public comment period again.

Key concepts: Fencing, Fence (mathematics), Notice, Terrorism, Engineering, Computer security, Hazardous waste, Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Supplemental Environmental Assessment Anti-Terrorism/Force Protection Upgrades at Beale Air Force Base, California — Research Paper | ScholarLens